Right, we need eight? Yeah. All right. The Committee on Environmental Protection and Energy will come to order. Good afternoon, everybody. Thank you for being here today. Today, the committee has one agenda item, a subject matter hearing regarding the provision in SO2024-0008201, which directed the Department of Environment to report on the environmental and energy impacts of data centers in Chicago. I will begin with a roll call to establish quorum. Chair Hadden is present. Vice Chair Knudsen. Alder Espada. Alder Ramirez. Alder Lopez. Present. Alder Tavares. Present. Oh, we'll get to you for the Rule 59, Alder Tavares. Alder Sigcho-Lopez. Alder Cruz. Alder Rodriguez-Sanchez. Alder Conway. Alder Riley. Present. Alder Lawson. Alder Clay. Alder Martin, and Alder Manaa-Hoppenworth. All right. We have nine members? Nine members present. We have a quorum. Joining us virtually are Alders Tavares, and per Rule 59, could I have a motion to approve Alder Tavares' remote participation now that we've established quorum? All right. Alder Manaa-Hoppenworth so moves. All those in favor say aye. All those opposed, nay. In the opinion of Chair, the ayes have it. Fantastic. And Alder Tavares, thank you for being here today. You'll be marked present. Non-members? Nope. So at this time, we will begin the public comment period. Public comment is limited to 30 minutes, and out of respect for everybody's time, each speaker is limited to three minutes. Our first speaker for public comment is Shakeena Sims. Good afternoon, everyone. I'm Shakeena Sims with NRDC Safe Water Initiative. As we continue discussions around data centers, I want to ensure that one resource that affects every Chicago resident, business, and neighborhood doesn't get lost in the conversation, and that's water. Studies show that low-income households spend a disproportionate amount of their income on water bills. At the same time, Chicagoans are looking to their leaders to invest in long overdue infrastructure upgrades to deliver safer drinking water to their homes and alleviate flooding in their basements. Safe water and a dry basement shouldn't be a luxury, and affordability shouldn't be an afterthought. That's why it's important that we're careful about the demands we're placing on our aging infrastructure and the pockets of our residents. There is rapid data center growth across the country, and communities across demographics continue to voice concerns. On the energy side, utility bills are skyrocketing and residents are at threat of disconnection due to high energy burdens. On the water side, residents share similar concerns. How much water do the data centers use? Will usage result in higher water bills and lower water pressure? And what other environmental impacts are at play, especially on communities already burdened with pollution? That's why community voices must be meaningfully included at every stage of the process. It builds trust and ensures local priorities and concerns are reflected in decisions that will ultimately affect communities for decades. The community deserves transparency. Data centers should be required to report water usage, and the information should be clear and accessible, and that transparency must be paired with accountability. Reporting is one thing, but what are the consequences where shared commitments and standards aren't met? These are just two pieces of a much broader list. There's also a lot for us to learn from other communities across the country. But community involvement, transparency, and accountability should always remain at the forefront. Thank you so much. All right. Thank you. Our next speaker is Ayanna Simba. Hello. Good morning, committee. My name is Ayanna Simba, and I'm here on behalf of the Illinois Environmental Council as their City Government Affairs Director. IEC, we represent nearly 130 environmental orgs across the state, including many that are here in the room today that work on environmental policies here in Chicago. And I want to talk about this data center report. First, I want to say thank you to Committee Chairwoman Hadden for hosting this hearing. Second, I want to thank the Sustainable Data Centers Working Group for putting together this timely report. As artificial intelligence continues to be widely adopted, we are seeing an unprecedented level of data center expansion. Chicago specifically being along Lake Michigan and experiencing long, cold winters is an ideal place positioned for data center expansion. And while there are already data centers here in Chicago, 39 to date, the city's current policies and regulations related to them are far outdated and do not reflect the growing demand of AI. Data center zoning is currently classified in the same category as office buildings, and it can be permitted by right, meaning they experience a streamlined approval process and does not require public hearings or special conditions, of course, depending on the size. While some data center construction may trigger the plan development process that does include public comment, all data centers, regardless of size, location, et cetera, should require input from the public and the local alderman. Related to zoning, in a city where we have one of the highest asthma rates in the country and we are experiencing more heat waves, we need additional regulation for diesel backup generators. These generators not only increase greenhouse gas emissions, they also release large amounts of pollution during peak hours and emergencies. They are also a major source of noise pollution when generating up to 105 decibels, which is basically comparable to a jet flying overhead. Equally, we need renewable energy requirements for data centers. There are existing battery storage technology that can replace diesel generators and provide cleaner, quieter, and more reliable power backup. We also cannot talk about data centers without recognizing their electricity and water demand. Chicago's already experiencing brownouts and aging infrastructure with high summer demand. When we have these large data centers that cluster in neighborhoods, they intensify the strain on the grid. We also know that there are water impacts from data centers as well. Lake Michigan is vast. However, we are already seeing an increasing number of suburbs that are seeking water from the lake from the City of Chicago, and we have residents who cannot afford their water. At minimum, we deserve transparency around data center water and energy usage. Finally, this report is a long time coming. Almost two years ago, IEC and our partners worked closely with Alderman Villegas, whose leadership on this has led to the consideration of environmental challenges for future data center approval, and we also thank him for his expressed support of the POWER Act. With this, we hope that the data center report will in- You almost made it. Our next speaker is Mr. George Blakemore. One, environment is very important. Historically, pollution and waste have always, and these data centers or whatever, have always been in the poor neighborhoods. The poor neighborhoods. The rich, they don't have this problem. Did you know the rich live longer than the poor, too? And they get all kind of benefits. So the negative effect that these data centers have on the poor, particularly poor Black people. Poor Black people. I have seen this happen on the North Side with these steel mills leaving the Lincoln Yard and going to the 8th Ward. Well, the Black ward. So Black people, you should have a vested interest in these data centers, and see how many of them will be placed on the Gold Coast in the rich areas. See, America has rich and poor people. America have Black and white people. People that was enslaved in America. Enslaved in America. Not God bless America, but God didn't bless these Black people came over here. Now I'm giving you a little history. So when they get ready for these data centers or daily whatever, or whatever, Mr. Blakemore, be more articulate. They going to put them in the hood, in the poor areas, not in the rich. In a capitalist system, the golden rule is he who has the gold. This is not a democratic system. They all here are Democrats. They're not talking about that big H white man, Trump. Right here is racism, nepotism, corruption. Right here. So these centers will be placed in the poor Black areas. Why not? Why not in the rich areas? In the rich white areas? They're looking at me. Why not? So that's why it's very important for a man of Mr. Blakemore caliber to come to these meetings, to call them out. Waste, fraud, and abuse. Well, it goes on here. Racism with these data centers, where are they going to be placed? And this is only subject matter only. When you know better, you do better. They will be placed in these poor areas, poor Hispanic areas, poor white areas, poor Black areas, so that- Thank you, Mr. Blakemore. Next up, we have Henry Winston. And I'd like to recognize Alders Cruz and Ramirez for purposes of quorum. Thank you for joining us. Hi, my name's Henry Winston. I'm a resident of Chicago, and I'm here representing Sierra Club. We're very concerned about data centers in the city, especially as the fight continues throughout the state Speaking on the same issues that have already been brought up, we're concerned about the effects on the energy grid, and we would like to see prioritized data centers bringing their own clean energy onto the grid to operate off of. Like Ayana brought up, Chicago is already experiencing issues with brownouts. We saw New York have significant brownouts as the load increased on their energy grid with summertime heat waves. That's an issue we'll only see increase with climate change, and we're only going to increase the load on our already aging electric grid infrastructure. And so we think it's of the most importance that these new data centers are bringing their own clean energy to operate off of. Also with water, making sure that there are publicly available information and clear reports and robust enforcement of those metrics. Sierra Club just last year sued the Trump Tower downtown for improper maintenance of their water system and pulling in too much water from the Chicago River. So we've seen that if the buildings in the city are not held accountable, that they will abuse our natural resources. Also speaking on land use, data centers provide jobs in the short term, but in the long term, they provide very little economic opportunity, and they're a permanent land use change in the city. And we're also worried about potentially overbuilding our concrete infrastructure as computing capacity keeps getting smaller. What is the city going to do if we have multiple data centers taking up massive tracts of land that we have to tear down because they have no current usage anymore? So we'd like to see robust shutdowns and a lot part of putting those stops in place is also having transparency with the community and having community meetings and guarantees of CBAs. If we're going to be bringing noise pollution and potentially air pollution into these communities because they're supposed to see some type of reward and tax incentives, or that they get that on the back end, we have to see those CBAs secured for those communities. And we are very concerned about the usage of those diesel generators to secure that 24/7 operation for data centers. And we know that is heavily related to asthma in communities. So Sierra Club would like to see the fight on environmental issues continue along with community transparency and government accountability. The fight is happening on the state level, but we need to make sure these occurrences are happening on the local level. There are state legislators across the state who are signing NDAs to have conversations with data center developers under the guise of them disclosing proprietary information, and we need to see practices like that stopped and we need to see practices like that prevented against in our city officials. Thank you so much for your time today. Thank you. Our final speaker is Jane Goldenberg. Hello. My name is Jane Goldenberg. I'm a resident of the 44th Ward and a member of the Chicago Metro chapter of the Climate Reality Project. Thank you very much for taking up this critical issue. As we've already heard, data centers pose a multiplicity of environmental and economic challenges. They also present a significant obstacle to our city achieving the goals outlined in the 2022 Chicago Climate Action Plan to significantly reduce greenhouse gas emissions from buildings. The fast expansion of data centers supplied mainly by nuclear power is overwhelming our energy supply. As a result, there is more pressure to add power from methane gas backed by diesel generators, the worst of the worst for local particulate pollution. Chicago data centers should be required to get their power from renewable energy to protect the livability of our planet and our air quality. We are already suffering harmful impacts from climate change, such as heating and flooding, as well as threats to our wildlife and ecosystems. The air quality is threatened by the dirty emissions from fossil fuel vehicles, our air quality, and regional polluters such as the three steel plants in Northwest Indiana. According to Climate Trace, those three steel plants are the third, fourth, and fifth largest emitters of greenhouse gas emissions in our region, not to mention their noxious pollution. Our top regional source of greenhouse gas emissions is road transportation, and second, residential buildings. The upshot is that the pollution from data centers or steel plants doesn't stay put. This is a regional issue, and Chicago should actively be working with legislators in the General Assembly to pass the Power Act. Estimates vary about the number of data centers in Chicago, with many concentrated on the South Side, which as we have heard, many projects due to come online in our region are planned for the suburbs. All of these threaten the ability of the grid to keep up with demand. Goldman Sachs projects electricity demand for US data centers will double by 2027. As of 2025, data centers account for 2% of total emissions. According to the report, the pressure on our grid will intensify in the summer, when their share of total US peak power demand is projected to jump to 8.5% in 2027 from 4.2% in 2025. This is a time our grid is already under great strain. Of course, data centers are only one significant source of greenhouse gas emissions. To put this into context, another concerning growing source of emissions is petrochemical production, primarily for plastics, but also for fertilizer. These emissions already account for 5% of total US greenhouse gas emissions comparable to the entire national footprint of Poland. A study by the Rhodium Group projects those emissions could grow by one-third from 2023 levels by 2030. Estimates vary, but as much as 40% of plastic production is for packaging, much of this for single-use plastic. At the end of the day, your actions on data centers as well as other sources of greenhouse gas emissions should be driven by concerns about affordability, the safety of our air and water, but also about our climate. That is the quality of life for our children and grandchildren. Thank you for the opportunity to speak today. Thank you, and thank you to all of our speakers today. That concludes our public comment period. I would like to note that the committee received one written public comment that has been emailed out to committee members via city email. Our first order of business is our Rule 45 report from May 11th, 2026, which was distributed to the committee. Could I have a motion to approve that May Rule 45 report? All right. Alderperson Romero so moves. All those in favor say aye. All those opposed say nay. In the opinion of the chair, the ayes have it. To the meat of our meeting today. So our only agenda item is the subject matter hearing on a report from our Department of Environment regarding the environmental and energy impacts of data centers in Chicago. This report was triggered by the passage of SO2024-0008201, which set requirements for the city data to be processed, stored, transmitted, and, yeah, disposed of within the United States. It also provides preference to bidders with our Department of Procurement Services for data to be stored in data centers located within the city of Chicago or the state of Illinois. The second section of that same ordinance triggered this report, which convened the Sustainable Data Centers Working Group to analyze the impacts of data centers and make recommendations for city council to consider as the proliferation of data centers accelerates across the region. Currently, we have approximately 39 data centers in Chicago, with Illinois having some of the largest numbers of facilities and the highest power consumption in the US. The explosive demand for AI has driven the expansion of data centers nationwide. Chicago is seen as an attractive market for data centers because of our skilled workforce, our fiber optic network, our central location, energy infrastructure, proximity to fresh water, and other things that you all mentioned, many of you know. And of course, we're the best city. We know this, but we connect both US coasts and serve as a major financial hub with strong growth, which is why our region is seeing increased interest. As we see this expansion continue across the region, municipalities have addressed data centers with mixed approaches. While some have embraced data centers, touting their economic development opportunities, others have seen neighbors turn out in large numbers in opposition to new data centers in our communities. Some municipalities have issued moratoriums or imposed legislative actions to regulate data centers in their communities, and the Sustainable Data Center report includes a table of legislative actions taken by cities across the US. You'll find it in the appendix, starting on page 55. The expansion of data centers and data center adjacent facilities presents environmental consequences due to the high energy and water consumption, which we'll learn more about during today's hearing. We've also seen utility ratepayers see significant increases in monthly electric bills due to increased demand that data centers are putting on our grid. Today, we'll hear from our Department of Environment, the Department of Planning and Development, and a panel of experts who will share results from the report and provide insights into how cities and regions are addressing the issue and facilitating dialogue on potential legislative avenues so that we can protect and benefit for all Chicagoans. Ahead of today's meeting, we did email the Sustainable Data Center report from the Department of Environment to committee members to review, as well as extended an invite to committee members for the Committee on Economic, Technology, and Capital Development. I'll say, as we are about to hit another heat wave, many of you know, certainly our panelists who are here, many who are in the audience who have attended committee hearings before, we find ourselves urgently trying to take action, and I think one of the things that we try to use the committee here for is to bring the urgency we're feeling, right, from the heat waves, from the changes we might be seeing in other cities and municipalities. I think I've observed a lot of concern. I think very legitimate concern and, in some cases, fear as we see technology moving faster than we can legislate, as we see development sometimes happening faster than we can legislate. And as we've seen, I think maybe not yet here in Chicago, but in other places where the process is opaque, right? Where all of a sudden, four football fields of land are taken up and energy and water are promised through a sole source process and community members don't see. And while again, we haven't had that happen here in Chicago, I think that everyone gathered here and with the purpose of the report, that's really what we're trying to address. From data centers to other large developments, we really appreciate you, Commissioner Tovar, and your team, helping us to answer these really difficult questions. How do we as a city grow? How do we have economic development? How do we keep up with technology? How do we stay relevant and central in our city? And how do we do it without repeating the same environmental mistakes and harms that have happened to our communities in the past, without overburdening people while making safe and sound decisions, while setting guidelines first Before diving in to just another boom. So, really appreciate you guys to be here. And for everyone that's here, this is an opening conversation. I don't imagine it will be our last conversation as we try to just grapple with these questions. So, joining us today we have Commissioner Angela Tovar, Deputy Commissioner Paula Cicchiao, and Jared Patton with the Department of Environment. We have Sarah Moskowitz with the Citizens Utility Board, Andrew Wren with Prairie Rivers Network, Kavi Chintam with Vote Solar, and Craig Huffman with MetroEdge. Bradley Roback from the Department of Planning and Development is also joining us today. Thanks for being our flank over there. And we can all shift in a little bit more too, when as needed. So, he's here for the Q&A portion of the meeting. So following all panelist testimony, we'll have time for Q&A for members. And with that, I'll turn it over to our panelists to more fully introduce themselves and start their presentation. And we'll start with you, Commissioner Tovar. Good morning, Chairs Hadden, members of the committee, and members of the public. My name is Angela Tovar, and I'm the Chief Sustainability Officer and the Commissioner for the Department of Environment. I want to first thank Chair Hadden for her leadership, and the opportunity to present the recommendations of the Interdepartmental Sustainable Data Centers Working Group. One of the city's fundamental responsibilities is to protect the health of our residents and the infrastructural and natural resources on which our communities depend. As data centers continue to expand in Chicago, it is critical that our regulatory framework keeps pace with their demands on our energy system, water resources, air quality, and surrounding neighborhoods. Chicago's climate commitments and sustainability goals require us to proactively address these impacts before they become more difficult and more costly to mitigate. The recommendations before you are intended to strengthen environmental protections, improve accountability, and ensure that future development better aligns with the city's sustainability priorities while ensuring that our economic development goals continue to advance responsibly. Next slide. We'll begin with why this work was necessary. We'll then provide background on data centers in Chicago and the environmental and community impacts associated with their growth. Next, we'll discuss the working group's process and the extensive engagement that informed these recommendations. Finally, we'll present the working group's recommendations for strengthening Chicago's regulatory framework. The first portion of today's presentation provides context before we discuss each recommendation in greater detail. The next slide, sorry. The city did not undertake this effort in anticipation of future challenges alone. We undertook it because residents, policymakers, and city departments recognized that existing regulations have not kept pace with the scale and impacts of modern data centers. The next few slides explain the problem we set out to address, the process that we followed, and the recommendations. Data centers are expanding rapidly in Chicago, and with that growth comes significant environmental impacts. These facilities can consume substantial amounts of electricity and water, contribute to greenhouse gas emissions through increased energy demand, and create persistent noise and diesel air pollution in surrounding communities. Many of these impacts are borne most directly by residents nearby, making thoughtful regulation both an environmental and quality-of-life issue. Chicago's current regulatory framework was not designed for today's modern, more resource-intensive facilities. The working group was charged with identifying practical policy changes that better protect public health, infrastructure, natural resources, and community quality of life. The working group approached this effort, next slide, sorry, with a simple question. What policies are needed to better protect people and the environment as this industry grows? For over about 18 months, city departments worked alongside technical experts, utilities, community leaders, environmental experts, Chicagoans with lived experience, and industry representatives. Throughout this process, Chicagoans consistently emphasized concerns about air pollution, noise, water consumption, transparency, and environmental justice. Those concerns helped us shape the recommendations before you today and reinforced the need for stronger environmental oversight. Next slide. The working group's recommendations are centered on prevention, accountability, and environmental protection. They call for stronger safeguards to reduce pollution and better protect nearby communities. They recommend updated zoning policies so environmental impacts are considered before facilities are approved for construction. And they establish greater transparency around electricity and water consumption so the city can better understand the impacts and make informed decisions on the future of our water and energy use. Collectively, these recommendations recognize that public health and the environment must remain central to how Chicago manages the continued growth of data centers. Before discussing these recommendations, next slide, it is helpful to understand what data centers are and why their impacts have become an important environmental policy issue. This will be covered by Jared Patton, the project manager at Department of Environment. This next section provides the background and explains why the working group concluded that updates to Chicago's regulatory framework are warranted. We'll then return to the recommendations and discuss each of those in detail. Thank you. All right. Hello, everyone. Thank you for that introduction, Commissioner Tovar, and thank you to the committee for having us here today. We definitely appreciate the opportunity to share the work that we've been up to for the past year and a half. As Commissioner Tovar mentioned, I will be providing an overview of data centers generally before- Chair, are you able to move the mic a little closer? Yes, I can. Is that better? Yeah. There we go. Okay. Sorry about that. For the recording. All right. Well, thank you all for having us here today. I'll be providing an overview of data centers generally, and then our working group process specifically, and I want to start by providing a working definition of what we mean when we say data centers to make sure that we're all on the same page. Throughout our process, we have thought of data centers as facilities that house computing equipment used to store, manipulate, and process digital information. Importantly, data centers can be standalone facilities that were purpose-built to function as data centers, or they can be one part of a larger mixed-use building, for example, a couple of floors on a mid or high-rise building. And it's important to keep both of those types of centers in mind as we go through this conversation. So, this is the definition. I think it's also helpful to look at some pictures so you can visualize what a data center is. So this slide shows the interior of a data center, and these facilities house rows and rows of server cabinets that contain the computing equipment, the processing chips, all of the material in interconnected rows. This equipment is highly specialized. It's expensive. But from an impact perspective, we are most concerned not with the computing equipment itself, but with the systems that enable that equipment to function. And specifically, we're talking about cooling systems and generators. And to get an idea of those systems, I think it's helpful to step outside of the building and look at it from the exterior. So this somewhat grainy image here is an aerial Google Earth image of a data center in northern Virginia. For this presentation, I'm going to be using examples from outside of our region so we can focus at the policy level and not get hung up on the details of any specific site. And there are a few things in this picture that immediately tip us off that we're looking at a data center. The first are all of these vents and fans and air compressors on the roof. This equipment is part of the cooling system. Data centers use a tremendous amount of electricity, and that electricity gets converted to heat. To keep the microchips processing or functioning, you have to remove that heat and push it outside of the building. These cooling systems function any time the computing equipment is functioning, which is typically 24 hours a day. So it produces a large amount of low volume, constant noise. These cooling systems can also use a lot of water depending on the type of system that's in place, and they also use a lot of electricity. In some cases, 40% to 50% of the electricity used in a data center does not go to powering the chips themselves, but rather keeping those chips cool. The next thing I want to highlight are these boxes that almost look like semi-trucks docked into the facility. These are industrial-scale diesel generators. Data centers sell themselves on their ability to provide continuous, uninterrupted power 24 hours a day, 365 days a year. And doing that requires one-for-one power backup, and today that almost always means diesel generators. Fortunately, we live in a region with a fairly secure grid, so these generators rarely power the facility themselves, but every unit must be tested once a month, and that test can last from minutes to hours, depending on what is being tested. And because diesel generators are dirtiest during the ignition process, this can produce a plume of diesel exhaust that is noticeable to people in the area, and it contributes to air pollution. Testing can also be quite loud. If you look closely, you will also see fuel storage tanks. If you're going to have several dozen diesel generators, you need to have fuel on-site to operate them. So you'll often see on-site fuel storage. And then finally, in the background, you can see this substation. Data centers use a lot of power, more power than is typically available in distribution lines. So they're typically located along high-capacity transmission lines. The electricity in those lines is at a higher voltage than the facility can use, so they need to have a step-down substation that converts it into a usable form. This equipment takes up a lot of space, and it's also quite expensive, and that's one of the reasons why we have seen electricity price increases in recent years. So, this is a typical purpose-built data center, and we have several facilities that look like this in our city. You might be looking at this picture and thinking, "That's not what Chicago looks like," and you're correct. In most cases, Chicago is denser than this, and for that reason, I want to also share examples of urban data centers. So this facility is located in downtown Boston. If you look closely at the building in the center of the image, you can see a lot of the same features from the last image are also present here. We have cooling systems, we have generators, but it's in a much more compact footprint. One of the big apparent things that you see when you look at this is that there are a lot more impacts when you're building in an urban area. Neighbors are closer. You can't have vegetative buffers, and that is, in fact, one of the things that we have heard from residents. Here's another example of an urban data center, this one coming from Charlotte, North Carolina. This is more of a mid-rise development. You see a lot of the same equipment on the roof, but what I want to draw your attention to here is the gap between the two buildings. That's a generator yard. There are several diesel generators at ground level, which is an attractive option for data center operators because it's cheaper, faster, easier to maintain, build, and service generators at the ground level, but that produces a whole another range of impacts for people in the nearby area. So you may be wondering, why would you build a data center in Chicago? Why are they being built here? There are a few good reasons for that. One is proximity to users. Chicago has a lot of people and a lot of businesses, and the closer a user is to the data center that is housing the software they're using, the faster that software will function. For example, if you're streaming a video, it will load much more quickly if it's being stored in a data center in our region rather than the other side of the country or the other side of the world. That's even more important when you talk about high-demand, complicated software that's processing a lot of data, operating things for purposes like operating remote machinery, real-time data analysis, automated services, things that are more of a commercial use. For those uses, proximity is very important. Additionally, City of Chicago has a lot of great infrastructure that data centers want to take advantage of, especially our access to long-haul fiber optic lines. The nation's fiber optic system was built following existing transportation and utility corridors, especially railroads and highways. And because we're a hub of both of those systems, we're also a hub of fiber optic connections. That is very expensive infrastructure to build, so if you build a data center directly adjacent to it, you can save a lot of upfront construction costs. The City of Chicago and the Great Lakes region also has abundant and relatively cheap water. There are, of course, concerns for sustainability in the region, but we charge much less for water than what is charged in more arid parts of the country. Then finally, electricity. We have historically had plentiful and clean electricity, which is very attractive to data center developers. I should note that electricity is also a constraint on the size of data centers that can be built. It is very difficult to build the amount of electricity infrastructure that's needed to power the largest gigawatt scale data centers. And as a result, the data centers built here tend to be more on the small to medium size. Then finally, a highly skilled workforce. Data centers are precision facilities. It takes a lot of skilled electricians, engineers, IT professionals, construction workers to build these facilities. It can be difficult to assemble those project teams in more rural areas, and that's not as much of a concern here in Chicago. All right, where are our data centers located today? Most of these facilities in Chicago are centrally located. The South Loop is probably the biggest hub. There are also a number of data centers that are built following utility corridors leading to downtown. In both of those cases, they are sited there to take advantage of the infrastructure that's available, specifically fiber optic and electricity. Most of our facilities are colocation or enterprise data centers, which is to say they are not AI training facilities. We do not currently have any of the gigawatt scale AI training centers in Chicago. A colocation facility means that a developer has built a facility, and they rent out some or all of their server space to other users so that a business that wants to use a data center doesn't have to build their own. They just rent space. We have many of those here. And the final bullet point on this slide, Chicago's land use patterns and population density require thoughtful policy solutions. This is just an acknowledgment that we are not suburban Chicagoland, we are not northern Virginia, and we can't just copy and paste what other people have done here. We need to be really thoughtful and really careful to make sure that all of our recommendations are tailored to the specific context here in Chicago. Okay, so how are we regulating data centers today? Our zoning ordinance classifies data centers as electronic data storage centers, and they are permitted by right in all commercial districts, all manufacturing districts, and some business districts. In practice, about half of the data centers that have been built here have gone through the planned development process. That's not because PD review is required, but because they are hitting other triggers related to their location or their size. Aside from the zoning process, there is currently no data center specific permit that a data center needs to receive in order to operate. My last few slides in this section focus on the specific impacts of data centers, and many of these have already been mentioned by other speakers today. One of the biggest concerns comes from price increases for electricity. The chart on the right side of this screen highlights the changes in demand in electricity in recent years. From 2000 to about 2022, the United States saw relatively flat demand in electricity, and that changed drastically a few years ago. We've already seen a small spike, but we expect to see an even greater spike in the coming years, and that's the right side of that chart. This demand has a direct impact on electricity prices because a good portion of our electricity bill is established by a capacity auction that takes supply and demand into account. There are also concerns for grid stability. Data centers use a lot of electricity in a very small footprint. In some cases, you're using as much electricity as an entire city in just a few blocks. Our grid wasn't built for that, so it takes a lot of planning to retrofit it. But the biggest concerns are at times of peak demand. When you have a heat wave or other disruption to our power system, there can be concerns about demand outstripping supply. And what we are likely to see here is not a blackout across the whole city, but rather data centers being kicked off of the grid. And when a data center moves the grid, it doesn't necessarily mean that it's shutting down. Instead, it means they're converting to that backup diesel power. And in a worst case scenario, that could result in several hundred megawatts of diesel generators operating in dense urban areas at a time of extreme heat when there are many other concerns people are dealing with. And then finally, all of this electricity has to come from somewhere, and we've already seen data centers prolonging the lifespan of fossil fuel power plants, and that's a major concern moving forward. In many cases, data centers have funded new, clean, renewable energy. They're one of the biggest funders of clean energy today. But that is not a requirement, and we are seeing a lot of power plants stay online to support them. The next impact is air and sound pollution. This is the biggest concern that we hear from residents through 311 complaints. If someone's making a complaint, it's almost always because the data center nearby is loud or it's dirty. Sound comes from cooling systems that operate at a low level around the clock, as well as from generator testing, which is a shorter period but more intense sound. Air pollution comes from diesel generator testing, and, as I mentioned previously, these generators are dirtiest when they turn on. If you have several dozen generators, even though you only test each one once a month, you'll often be testing several in one day. And then finally, water. This has already been mentioned a couple of times today. The amount of water a facility uses really depends on the cooling system in place. We have a statistic on the slide here that an average data center uses as much water as 1,000 households, but it is really hard to pin down what an average data center is. The centers that use evaporative air cooling are some of the most intense water users in the country today, at the same level as power plants. While other facilities with more efficient equipment use less water. And I mention this because of the final point. There is no requirement for water usage transparency, and that creates this interesting bifurcation where, depending on who you talk to, water is either a huge concern that needs to be addressed or it's not a problem at all, and it really complicates the policy-making process. So that is the conclusion of my overview of data centers, and I want to move briefly to highlight what our process for developing this report has been. And I'll begin with a quick timeline. So as was previously mentioned, this work started with a city ordinance passed in the fall of 2024. We began meeting as a working group in January of 2025 and have continued to have meetings for the past year and a half. In those early meetings, we explored what a data center is, what those big impacts are, what is most important for us as the City of Chicago to address, and then transitioned to having more conversations about recommendations and what are the tools at our disposal for addressing some of these impacts. Along the way, we did quite a bit of outreach, which I'll speak to in a moment. That included an industry roundtable earlier this spring, and a community meeting in May of this year. We released our report earlier this month and are here today to share our findings. Our working group has been interdepartmental in nature, with representatives from the Departments of Environment, Planning and Development, Public Health, and Technology and Innovation. A little more information about the outreach. We really focused our outreach on speaking with people who had more experience working with data centers than we do, or certainly have more experience in specific topics related to data centers. We casted a wide net. We spoke with businesses. We spoke with government agencies, policy people, academics, community groups. We wanted to get a wide range of opinions. Those engagements included informal conversations, roundtable discussions. We invited people to attend our working group meetings. We hosted conference meetings. We had webinars. A whole range of engagements. We also hosted an industry roundtable, as I previously mentioned. That included roughly a dozen people from businesses and industry-affiliated organizations. We discussed the current status of the data center industry in Chicago, as well as the future. We discussed some of the concerns that had come up and opportunities for addressing those concerns and really maximizing the benefits of data centers while mitigating those impacts. And then finally, we had a public meeting this past May. That was our community conversation on data centers. It was held at Arturo Velázquez Institute. It featured a panel discussion with several of the people who you'll hear from in a moment today, as well as an open house where attendees were invited to share their perspectives on a wide range of data center questions. You can see a couple pictures from that meeting on the slide here, and there is a detailed overview of what we heard, not just at that meeting, but in other parts of our process in the appendix of our report. Before I stop, I do want to highlight a couple of the things that we heard during that public meeting. There was widespread concern for air quality and sound, which aligns with what we've heard through 311. But there were also concerns about environmental justice, water, and then finally, transparency. And that means transparency not just about the impacts, how much water a data center is using, how much air pollution are they producing, but also the process through which data centers are approved and built. And then finally, there was broad support for additional regulation on data centers within the city. And that concludes my section, so I will now hand the microphone over to my colleague, Jared Pelliccio. You're getting double Jareds today. Thanks, Jared. So I'm Jared Pelliccio. I'm the first deputy here. I'm going to just close us out by circling back to where the commissioners started with, which was the key recommendations that the working group delivered to the committees in submitting our report. So if you want to go to the next slide. So like the commissioner said, we have three actionable recommendations that I'll talk about one by one right now. And then following that, you'll see that we also have several additional recommendations of actions that require further research and due diligence, but rose to the top of the working group's consensus as other items that should be evaluated. The difference being the three that you see on the screen here, the will of the working group is that these are action items that, in our opinion, council and the administration should begin considering specific development of language and policies. Whereas the second set that you'll see after that are a set of items that seem very promising but require some further research and evaluation. So I will go to the first of the main three recommendations. And hopefully you were listening to the first part of the presentation because this will build on a lot of the learning that we gained over the past year and that Jared ably presented over the past few minutes. So the first recommendation is strong environmental safeguards. As you heard, one of the consistent things that we heard from neighbors of facilities is concern about air and noise pollution and its effect on public health, on the environment, and on quality of life. And so that's what this recommendation is designed to responsibly address. This would occur through the city's Environmental protection part of its code, and then regulations rules that are used to implement that part of the code. This really is designed to address how data centers operate. You'll see in a second, we'll move to zoning. And so this is, as you see on the screen, the details here, if enacted, would apply to both new and existing facilities that fall within a definition of a data center in revised environmental protection parts of the code and any regulations that then also need to be enacted to implement those parts of the code. The good news here for all three of these recommendations, and for this one specifically, is that we did a ton of peer benchmarking, as you heard, and there are actionable things that can be done to improve the effects of air pollution from generators, and noise from facilities. There are things that can be done here, and the idea would be to work out details through revised environmental permitting requirements related to those impacts. So I'll go to the next recommendation. So the next recommendation regards responsible zoning and land use. I think absolutely one of the top-line conclusions of the working group was that the existing zoning requirements for data centers are to a large degree outdated and need to be modernized to meet the current state of the industry. As Jared Patton talked about, the nature and the intensity of data centers has changed over time. And our recommendation is that our zoning and land use requirements need to evolve and modernize with those changes. So this would occur through amendments to the zoning code. And the recommendation of the working group is that there's a series of aspects of the zoning code that could be modernized and specifics could be developed working with partners like DPD, who we've been alongside of during this process. That includes everything from use standards to siting requirements, thresholds that could trigger things like a planned development process or sustainable development policy requirements. And along with those substantive changes, additional changes to how community-- Oh my gosh. All right. We're going to take a brief recess. Brief recess. No, wait, we need to stop. You need to stop? Yeah, she's on the phone. But we should continue the presentation. Oh, 911? We're calling 911. Yeah. Who wants to- This is great. Don't worry about Sam. Here. Yeah, well done. It looks like she's- Thank you. It's automatically going to record. Oh, sorry. Hello, Sergeant. Arms just passed out in room 2018. All right. We'll reconvene. She's getting medical attention, just for everybody to know. All right, please continue. Okay. Thank you, Chair. So I'll return and recap this item. So we first talked about potential changes to environmental permitting that addresses public health, environmental, and quality of life impacts during operation. This proposed policy change of the working group addresses modernizing the zoning and land use designations for data centers. And we talked extensively about the changes that have occurred in the industry. There haven't been parallel changes to our zoning code as well. So, the recommendation here is to be very specific, changes to the zoning code, part of the municipal code amendments to the zoning code. There are a number of actionable things that can be done here. Use standards can be added to this particular use type. Changes could be made to siting requirements. Changes could be made to the threshold of certain additional reviews, so the threshold for a planned development review, the threshold for potentially data center-specific sustainable development requirements And then in addition, you've heard both from us and then also from the chair about a clear desire on the part of members of the public for additional ability to engage in process related to development of these facilities. So, our recommendation is when we're thinking about the substantive changes to zoning standards for data centers, also to think about additional community engagement requirements at that time. So that's the second major recommendation, and then the final is transparent data reporting and accountability. When it comes to this one, this is one where Chicago is poised to really be able to take action quickly here if the council so chose. And that's because, as many of you all may be familiar, we have an existing program here called the Chicago Energy Benchmarking Ordinance. This is an ordinance where buildings of a certain size are already required to report their energy usage, through a very standard platform used across the country called Energy Star Portfolio Manager. That platform also allows for water reporting as well. And in fact, it's a voluntary option even today for Chicago buildings. So, of the three of these major recommendations, this is by far the easiest to just fit on one slide, so to speak. What the working group is recommending is simply better data on how these facilities are impacting energy and water in Chicago. And there's an easy way to do that, which is to change our energy benchmarking ordinance to require that they do so. Of course, we would have to work out the specifics of the type of facility that has to report and ensuring that there's a way of identifying those facilities to enter into our database. But it's very easy to summarize in one slide the path forward for this particular of the three major recommendations. I will now go to what I mentioned earlier, which is five additional items that rose to the top absolutely of our work, but require continued action and continued evaluation, as opposed to the first three, where we recommend that the council and the administration consider specific policy development immediately. So those five are looking at how the city sets its rates for industrial uses, including data centers, but this would obviously involve a look at other uses of industrial facilities that utilize Department of Water Management-provided water. So that's the first one. Second one is obviously kind of wrapped up in that same conversation, which is encouraging greater water reuse. If you do follow this industry, you'll see a lot of talk about creating ways to use what's called gray water, which is water that's already been treated, as opposed to potable water. There's a lot of room for innovation. And in fact, as you all probably know, Chicago's a leading innovator in the water space. Our recommendation is that we should really take a close look, along with partner entities here in the region, as to how we could encourage pilots and full implementation of water reuse strategies. Third is again another of those sort of circularity concepts, which is, as Jared Patton talked about, these facilities generate a tremendous amount of heat. There is an entire industry in industrial engineering that focuses on reusing heat from industrial facilities to generate power and energy with that heat. And so there's a lot of opportunity here. Again, this wouldn't be something novel solely to the data center world. It would be a matter of pushing for innovation and pilots within this space, building on waste heat strategies that have been used elsewhere geographically and in other industries. Fourth, you'll hear in a second, as I pass the baton to the other panelists, you'll hear in a second about strategies for ensuring that communities that host data center facilities receive benefits themselves. And so that was a clear message we heard both in our community meeting and in discussions with various other stakeholders over the past year. And five is kind of just a catchall. So I'm going to pass the baton in a second. So with that, we thank you for attending our Data Centers 101 class over the last few minutes. We're excited to answer any questions that you have. But we're also excited to hear from a bunch of really great panelists who have additional perspectives. And as we close, that's the list of folks here at the city that generously gave their time in participating on this working group. Fantastic. Thank you so much. Thank you to the Department of Environment for that presentation. And for committee members, don't worry, and the public, these slides will be made available publicly, if you couldn't get all your screen grabs just yet. All right, now we'll hear from Sarah Moskowitz from the Citizens Utility Board. And you're a pro at this, but don't forget to bring that pole, you can move that mic. Thank you. Is this on? Yes, it is. Great. All right. Thank you, Jared, for setting me up here. I hope not to be too repetitive. And thank you to Chairwoman Hadden and members of the committee for allowing me to speak today. I'm Sarah Moskowitz. I'm Director of the Citizens Utility Board, or CUB. We are a utility consumer advocate working throughout the state of Illinois. And for the past several months, my CUB colleagues and I have been traveling the state, speaking to rooms packed with people- Absolutely livid about data centers. Data centers have really become a focal point for a broad set of concerns, including environmental impacts like air and noise pollution, questions about corporate accountability, along with deeper anxieties about what artificial intelligence means for our jobs and for the economy. But I was invited today to talk about the impact data centers have on electricity costs and examine possible solutions to protect everyday customers from shouldering the bill for big tech's energy needs. Data centers have been around for many years, but AI is now driving a trend toward larger, more power-hungry facilities, the largest of which can require the same amount of electricity as a medium-sized city, although not the ones we're seeing so far in Chicago, obviously. Our electric bills have already gone up because of data centers and will continue to do so unless policymakers at multiple levels take action. To drill down on how this works just a little bit, Illinois is a restructured state, meaning that our local distribution utilities, like ComEd, do not own power plants. ComEd doesn't generate the power that they sell to us. ComEd makes its money off of building and maintaining the infrastructure to deliver the power to us locally. The price for the electricity, the juice itself now, that is set by wholesale power markets, and the one that serves ComEd's territory is called PJM, which spans 13 states from here through the Mid-Atlantic, including Virginia and Washington, D.C., Pennsylvania, New Jersey. You can see the distinction on your ComEd bill. I forgot to bring my ComEd bill, but there's a part of your bill labeled delivery, which is overseen at the state level, whereas the supply portion of your bill is the part that's more directly subject to the vagaries of the markets, which are ultimately overseen by the Federal Energy Regulatory Commission. Data center costs are hitting us in both places. To start, we have the higher delivery transmission charges to cover data center-related grid upgrades. In an Illinois Commerce Commission proceeding currently underway, we just found out that since 2021, ComEd has spent more than three billion, billion with a B, dollars to connect large facilities to the system. Most or all of those were data centers. The deposits that ComEd collected from those customers, however, only covered about 25% of those costs. The rest, who pays for the rest? You and me, everyone else. Now, the utility did recently increase certain deposits and charges for large loads, and that is good. Requiring these large customers to put more skin in the game when they request to interconnect is definitely better than how things were before. But according to our preliminary calculations, even had that updated policy been in place these last five years, the rest of ComEd's customers would still have been left covering a huge chunk of big tech's interconnection costs. We're still working on the math of that, and it's really hard to get more precise on how much would be socialized under current regulations, because largely, we don't know which of those giant customers will actually show up. If the data centers all max out their load ramp and pay maximal transmission security agreement charges, less of their interconnection charges costs are socialized. On the other hand, if the large loads don't show up or use less than they say they will, the rest of us end up paying more. So it's not just the vast appetites of these hyperscalers that's throwing our system out of whack. It's the speculative nature of data center development, too. We're also seeing the effects of all this on the supply side of the bill, as I said. Soaring demand projected for new and proposed data centers has tightened the supply-demand balance in the wholesale markets and increased the cost of reserve electricity or capacity at the auctions that are run by PJM. PJM's independent market monitor found that data centers were behind the capacity price spike that ballooned ComEd customers' bills starting in June of 2025, which actually coincided with a giant heat wave, so we saw some insane bills last summer, as we're seeing this summer. The independent market monitor at PJM said, quote, "The current conditions are not the result of organic load growth. The current conditions in the capacity market are almost entirely the result of large load additions from data centers, both actual, historical, and forecast." Forecast. All of these expenses are locked in ahead of time based on forecasted future energy demand. Data center development is notoriously speculative, however, and these forecasts certainly include projects that will never actually get built. Unless data center developers make the necessary financial commitments up front, the rest of us are left holding the bag. So you're probably getting the sense that as a ratepayer advocate, I'm mostly focused on cost implications of data centers and protecting everyday consumers from shouldering those costs. But there are indeed system-wide and local environmental impacts, too. Over the years, the state of Illinois has enacted some really ambitious clean energy goals that I think we can all be proud of. But unfortunately, the load growth we're seeing from data centers is threatening our clean energy progress at the state and regional levels. There's more to come on that as state regulators put together Illinois' first integrated resource plan under the Clean and Reliable Grid Affordability Act, which is due to be filed this November. This IRP will, among other things, address whether adjustments to the state's clean energy targets will be needed to ensure ongoing resource adequacy. Our clean energy targets were set before data centers were really a thing, and now data centers have come on the scene and have thrown all of those goals into question. So what to do? This is a ComEd-wide problem, this is a state-wide problem, this is a PJM-wide problem, and ultimately it is also a national problem, and work has been happening at all levels. For example, FERC recently issued a show cause order to the six regional grid operators, including PJM, giving them two months to either justify why their current rules are just and reasonable with respect to data center load, or if not, to file tariff changes to make them just and reasonable. For its part, PJM is also working on the issue. I won't get into that, spend way too much of my time dealing with PJM, but I'll just say that given their governance structure, we are very concerned that the policies adopted by PJM will not go nearly far enough to protect residential electricity customers. And whatever happens at the federal and regional level, we are going to need state action to ensure everyday customers don't end up on the hook for even higher costs due to data centers. And that's why CUB is one of many organizations, many of whom are represented here in the audience, that support the POWER Act, HB5513, which would require utilities to create new rules to protect their existing customers from subsidizing data center related upgrades to transmission and distribution infrastructure. It would also require data centers to bring their own new clean power if they want firm electric service that won't be curtailed at times of high demand. And we're working to get language added that makes clear that any costs coming down to us from PJM, that PJM identifies as being data center related, actually get allocated here at the utility level to the customers that brought about those costs. So here we are in the city of Chicago, and I'm here to reassure you that meanwhile, there is plenty that we can do at the municipal level. I applaud the working group's recommendations that the city create a permitting program specific to data centers and update the city's zoning ordinance to address data center impacts. Curbing the air and noise pollution impacts of these facilities will be key to protecting Chicagoans' quality of life. When I go to some of these really spicy meetings out in the suburbs, people are most angry about noise. And the City of Chicago is in a position to establish strong environmental safeguards, and I urge you to do so. I'm also pleased to see that the working group called out the need for transparent energy and water use reporting. As Jared said in his presentation, it's hard to regulate something without the details. And I think it's wise to keep in mind the potential for waste heat reuse and the city's leverage when it comes to hammering out community benefits agreements or similar mechanisms to bring value to residents when a development is proposed. I'd also like to flag the opportunity that revisiting the city's franchise agreement negotiations with ComEd might offer us. If you remember that in early, I think January of 2023, an agreement was reached in which the utility would have been granted a 15-year contract extension in return for, I think it was $100 million for the city to use to combat climate change. That agreement never went anywhere for a lot of reasons, but I'd like to remind everyone that the franchise is still there as a potential point of leverage. Because with or without the data center related challenges, many of my recommendations for the city actually remain the same. Mostly, it's find ways to support your residents who are struggling to afford their bills. All of the regulated utilities in Illinois submit reports to the ICC each month, listing credit and collections activities for their customers by zip code. To all the aldermen here, check out your zip codes on those reports. It is fascinating and heartbreaking. Those numbers are clear that when it comes to utility affordability, ComEd customers in Chicago are much more stressed than customers across the entirety of ComEd's footprint. In May, this is the most recent data we have right now. It's from May. Nearly 20% of ComEd customers in Chicago were behind on their bills. In the three worst off zip codes, nearly 32%, almost a third of residential customers were behind on their bills and assessed late payment fees. So I love it when the city intervenes in ICC proceedings. These are the dockets where millions of dollars of ratepayer money is on the line. As I mentioned, the city can also use franchise and procurement negotiations to secure affordability commitments. It can coordinate with ward offices and city departments to better connect residents to programs, and it can make it easier for households to get solar and battery storage installed, especially given that the state does have programs in place to install solar and soon battery storage in low and moderate income households. And what a great way that is to help people keep their homes safe and comfy while saving energy and money. So I look forward to continuing the conversation on all the ways we can work together on this, and thanks again for letting me talk. Thank you. Thank you for your presentation and your willingness to show up, as always. Next up we have Andrew Wren with Prairie Rivers Network, who's joining us virtually. Andrew, you can unmute now. Can you hear me okay? All right. Try again. Can you hear me okay? Yeah. That's a yes? Okay, great. I'm going to quickly share some slides and-- Oh, I have to request. My name's Andrew Raine. I'm the climate policy director at Prairie Rivers Network. We're located downstate in Champaign. But we work statewide on water resources issues, and I've been working on data center issues for a year and a half now, actually, with Sarah and Covey in the room there. And we've been thinking about water issues, of course, for decades. Our organization has been around for 59 years, 60 next year. So, a lot of experience on water resources issues. Let me see if I have sharing yet. I do. Great. And I do want to say I just came off vacation, so these slides are a little bit shorter than I-- Not shorter. A little bit less comprehensive than I would like them to be. And I do want to give a shout-out to the Alliance for Water Efficiency, who have a really excellent slide deck. If you want to learn more about anything that I say here today, I've shared a link in the end of the notes for looking in their resources because-- And actually, Joanna with the Alliance for Water Efficiency was the person that I recommended before myself for speaking here, but she wasn't available. So, you got me instead, and I'll do my best. And the other thing I want to say is, I think you've got a very comprehensive-- Your team at the department has very comprehensive understanding of this, and I think their presentation was really good. So I will go quickly over things that I think maybe they've already covered. I also thought the comments by Illinois Environmental Council and NRDC in the public comment section were very good, addressing the challenges related to water resources and data centers. So with that, I'm going to just dive in, and I'll go through pretty quickly. Are the slides visible? Somebody thumbs up? Great. Okay. So, just a few things. Data centers, where are they getting their water, and where does it go? So, the vast majority of data centers, and I would expect in Chicago, probably all of the data centers-- Well, no, that's not true. A lot will get the water from community water supplies. They're going to get the clean drinking water and use that in their system. But some data centers may also be getting from surface water or groundwater. So that would be maybe a data center that's on the river that's pulling in surface water for once-through cooling. And then you also have the opportunity for wastewater reuse, which was mentioned as an opportunity by the Department of Environment, because that's a way to mitigate without using new water that your treatment plant has had to treat. If the data center can use wastewater, that sort of alleviates some of the burden that the overall system is bearing. I will say that some rivers do depend on wastewater, especially down where I live, that's more of an issue. But up in Chicago, there is a lot more flow, and wastewater reuse is definitely a good solution there. And then where does it go? It's kind of one of two places. They could be discharging directly to waters, so either probably a river or a lake, or data centers will often discharge to a wastewater treatment plant that will then take their water and treat it. So just so folks have an understanding of the different kind of possibilities here, and I think for the most part, we're seeing to and from community water supplies and to wastewater treatment plants. And as you've heard already today, data centers can use a lot of water. The primary way that data centers use water is for cooling. And this will depend a lot on the technology that the data center chooses to use. There are ways to use actually very little water for cooling, that would be like air conditioning your data center, or there's ways to use a lot of water. But a larger data center with cooling technology that evaporates water can be using a really substantial 5 million gallons per day amount of water, again, depending on all that technology. And our statistics on this aren't as good as the energy use statistics because there is less reporting. There is less transparency. And so I want to underscore that need for transparency and reporting on data center water use, because I think that will help us truly understand what the actual usages are and how we should be responding to them. The other key consideration here is what happens off-site. Because data centers, as you've heard, use so much energy, there's a lot of off-site water usage from that energy generation, and that is actually a big portion of their impact as well. So there's kind of two angles you need to think about water use in data centers from. So digging in on that cooling side of things, you have this kind of spectrum, and this is a fairly simple way to look at it. Typically, you're either using more water or you're going to be using more energy. And I think this is an easier way to look at it, but the real details are much more complicated depending on technologies. And this is in the Alliance for Water Efficiency's report, and it really breaks down the different technologies for water efficiency and energy efficiency and cooling capacity. As data centers become more heat dense or more resour-- As they're putting more and more of these energy-intensive chips into one place, they need more and more cooling because they're using more and more energy. A chip basically turns all of the energy they consume into heat. That is what a computer chip does. Computing power and heat are the main outputs. And so as you look at different cooling technologies, we start at facility scale coolings, like simply air conditioning the place, and you get down to things like direct to chip, and this is what we're seeing more and more of. That means that-- Or immersive cooling, where the chip is immersed in a fluid that is then being cooled. These component layer technologies are what you're seeing at the more advanced data centers that have higher cooling needs. Also probably more expensive, but that's for the data center to figure out. And as I was just saying, yeah, so you have the rack density. This is saying how much computing power Are you putting on a single rack? And you saw the racks and the images that were shared from the Department of Environment. And as you increase that density, you leave behind your air cooling, and you get to these more intensive or more direct to chip type technologies. And just what you want to think about when you're looking at cooling is that these are all loops. So when we talk about a cooling loop, yeah, maybe we're doing direct to chip, but that heat still has to leave the facility. And so you have to understand the full process of how do you get the heat away from your computer chips and out of your facility. And ultimately, that means that your heat is going to interact with air or water in some way. There is no truly closed loop, because that would mean that the heat is staying within your facility. So you have closed loops maybe within your facility, but eventually it reaches an exchange point where that heat has to leave. So, if you're considering regulations, you want to be thinking about what are the terminologies we want to use to ensure that, you can't just say closed loop, you have to be a bit more robust than that because the closed loop itself is not a singular technology. And the other side of this is then offsite water usage. And so I just want to make a point about energy consumption. The data center that was recently approved in Joliet is 1,800 megawatts, and Chicago uses 3,500 megawatts altogether as a city. So one data center is an energy demand almost half of Chicago. And there's another one like Joliet that's about the same size about to be approved. And so now we've got two that are going to be the same usage as Chicago. And Sarah with CUB kind of talked about what are the implications on our grid, to our bills when we think about these large data centers coming in. Well, the impact on our water resource is important to consider, too. That unprecedented energy demand, if it's met with things like natural gas or coal or nuclear, become very water consumptive. And this table on the right just kind of shows when you're looking at those technologies, we're talking about liters of water being consumed, versus renewable technologies, almost no water is consumed in the process of using renewable technologies to meet that energy demand. And so this synergy becomes really important when you're asking, as the city considering, what can we do to make our data centers have less of an impact on water? One of the answers is actually using renewable energy to mitigate that offsite impact, in addition to what might be happening onsite for water usage. So that just brings me to a list of things to consider when addressing water and data centers. The first is, as I think you've heard a couple of times now, let's get transparent usage planning, reporting, and enforcement. Let's know what our data centers are using. Let's make sure they're accurately reporting that information so that we have a base level understanding of where to go next. You might also consider water use efficiency requirements. So that can be technological minimums, things like you can't use once-through cooling, you have to use a closed loop system of some kind as a minimum. And then you get into that above that floor, innovations in technology, things like direct to chip that fall within that broader closed loop umbrella. Or you might look at energy metrics, things like water use efficiency or data center resource efficiency, which is a new metric that is being driven by industry, that looks at the whole data center bringing in power and water together as a metric. Aurora, for example, has set a water use efficiency for data centers that are going to be built in Aurora. They've set a fixed number that you have to meet. You also might consider evaluations on resource impacts. This is one of the things that we're proposing in the POWER Act. There's actually a study that's going to be done for each data center by the Illinois State Water Survey, if we get the bill. And that study will look at, okay, what is this data center's withdrawals actually going to do to the resource it's pulling from? What is it going to do to the river? What is it going to do to the lake? And it looks through the community water supply. So you have to know where a community water supply is getting water to really trace that impact through. You might want to consider, again, reducing offsite water impacts by requiring renewable energy to be providing the power for a data center. You want to be thinking about scarcity. So a data center gets built, it might be sustainable in the moment, but you want to be thinking about, what about our peak demands when there's peak heating needs? What does the water consumption look like at that data center, and how does it compete against other water consumptions happening that may also be at their peaks? And then also long-term scarcity planning. So droughts, what happens when a data center that's dependent on water for cooling hits a drought? And how are those resources allocated between the data center, between people who want to drink the water, between other businesses? On the infrastructure side, you want to be thinking about protecting ratepayers and consumers from infrastructure costs. So this can also come in the form of ensuring that any costs that are, let's say, your water treatment plant has to install a new system to meet the demand of a data center, and then that data center goes belly up. How are you ensuring that your drinking water infrastructure is not going to be paid for, that new infrastructure that has no usage is not paid for by your ratepayers, is instead somehow paid for by that data center? So you can do things like upfront bonding or other sort of financial mechanisms to protect yourselves. And then pollution. So, runoff from data centers, the footprint. You also have concentration effects as they evaporate water. That means that whatever's in that water gets concentrated. And for example, in Oregon, we saw nitrate pollution becoming an issue because the water that had nitrates in it when it came into the data center got concentrated, and then it was discharged with essentially water that had extremely high concentrations of nitrate. They didn't add that nitrate, but they made it a concentrated problem, and that became a problem for the treatment plant. And then thinking about are you discharging to water or wastewater treatment system? And then again, also flagged by your Department of the Environment, you have opportunities, things like waste heat reuse. So when a data center, what they're producing is actually heat, and it's all waste heat right now. If they're just trying to cool their data center, they're just trying to get that into the environment, so into the air or into water around it so that it goes away. Waste heat reuse says, well, what if we plug that into systems that actually want to use it? Thermal energy network that maybe is heating a block or being used by an industry. These are very synergistic that can actually reduce your impact because you're not wasting the heat, you're using it for something that's beneficial. And that wastewater reuse is another opportunity here for mitigating the impact of a data center through using something like wastewater from a treatment plant. Just briefly, at the state level, the POWER Act is proposing a water impact permit at the Illinois EPA level. And this is a yes or no on a data center based on an actual resource impact study. So the Illinois State Water Survey will look at, here's the data center, they're going to pull this much water from this river. What is it going to do to that river? Are its other uses going to be maintained? And that becomes a yes or no at the Illinois EPA. We're also requiring a floor of closed loop cooling, so that they have to look at different cooling technologies within the closed loop world and pick one that is at least as efficient as, so they can't do one through evaporative cooling if it's going to be wildly inefficient. And then ensuring that infrastructure costs are paid for by the data center and don't fall on rate payers one way or the other. And this is achieved through basic planning, a plan from the data center, and then also ongoing usage reporting, and all of that being made public on a publicly available website. And that's really all I have to share with you. I commend the city for taking on this process and for considering these questions, and the work that's been done by the Department of Environment is impressive. These links, I can send them if they're not available from the slides, so that they can be available, and I look forward to your questions. Great. Thank you, Andrew. I appreciate it. And we hope you had a nice vacation. Next up, we'll hear from Kavi Chintham with Vote Solar. Hello. Okay, cool. Good afternoon, Chair Hadden and members of the committee, and thank you for the opportunity to testify today. My name is Kavi Chintham. I'm the campaign manager for Illinois at Vote Solar. We're a national advocacy organization working to make solar more accessible and affordable across the country and propel us toward a 100% clean energy future. Vote Solar is also an active member of the Illinois Clean Jobs Coalition. I also hold a PhD in chemical engineering from Northwestern University, and I'm a resident of the 48th Ward here in Chicago, where I organize on the north side around environmental justice issues. The recent rapid growth of data centers here in Illinois and across the country raises fundamental questions about how we protect our communities, environment, power grid, and water resources. It is the growth of artificial intelligence that has created unprecedented demand for new data centers. These facilities, as everyone has been alluding to, are not simply another commercial development. A modern hyperscale data center is one of the largest industrial facilities a community can host and has real and lasting impacts on the communities where they're built and beyond. A single campus can require hundreds of megawatts of electricity, enough to power hundreds of thousands of homes. It may require significant amounts of water for cooling, dozens of backup diesel generators, and new substations and transmission infrastructure. Because of their scale, these projects affect land use decisions, water resources, air quality, noise, transportation, emergency planning, utility infrastructure, housing, economic development, and the quality of life of nearby residents. Chicago has a unique responsibility to address the outsized impacts data centers have on our communities because of its history. For decades, Black, Latinx, and low-income communities in the south and west sides in particular, have borne a disproportionate share of the city's industrial pollution and infrastructure burdens. That history has taught us an important lesson. We cannot evaluate new projects in isolation. We have to ask what they mean in the context of the pollution infrastructure and environmental burdens communities are already living in. That principle that cumulative impacts matter is one that environmental justice advocates in Chicago have fought for over many years and is increasingly being reflected in both state and local policy discussions. Over the past few months, as Sarah shared, members of the Illinois Clean Jobs Coalition, including myself, have engaged in town halls and community meetings across the state to listen to residents' concerns about data center development. Together, we've heard from communities in Waukegan, Rockford, Springfield, Aurora, and beyond. And repeatedly, we hear the same questions. Who pays for new infrastructure? Will utility bills increase? How much water will these facilities use? Will polluting diesel generators affect local air qualities? And will communities have a meaningful voice before decisions are made? These concerns are not hypothetical, and local governments across the state have already begun recognizing that existing policies are not enough. In Aurora, data centers were allowed under zoning rules that treated them like warehouses. Nearby residents began reporting constant humming, vibrations, and concerns about the scale of polluting backup diesel generators supporting these campuses, which they stated sounded like jet engines. Those experiences ultimately led the city to adopt a temporary moratorium in order to craft, and eventually passed, one of the most comprehensive data center ordinances in the country. In Sangamon County, residents raised concerns about a proposed 280-acre hyperscale data center campus expected to require up to 600 megawatts of electricity. Despite extensive public testimony, the project ultimately moved forward. That experience underscores why communities need clear standards and guardrails in place before projects are proposed, rather than trying to address these issues during a single zoning hearing. In Champaign and Morgan Counties, local officials chose to temporarily pause new data centers while they develop zoning standards that better reflect the scale of these facilities. And in Grays Lake, residents expressed frustrations not only with the scale of a proposed hyperscale data center, but also with how little information was publicly available during the approval process, prompting broader conversations in Lake County about model regulations and a temporary moratorium. And there are many more examples like this. These examples are all unique, but they point to the same lesson. Communities should not have to figure out how to regulate data centers one project at a time. Chicago has an opportunity to act on this lesson. This hearing and report should serve as the launch of this conversation so that Chicago proactively establishes guardrails before the next data center proposal is on your agenda. And at the state level, as folks have already said, the Illinois Clean Jobs Coalition has been working with legislators on the POWER Act, legislation designed to establish statewide guardrails for large data centers. And the bill also recognizes that some challenges cannot be solved by municipalities alone. Statewide protections are critical, but they're only part of the solution since many of the impacts people experience are inherently local. Furthermore, local policies will push for more comprehensive policies by state legislators, creating lasting protections that communities can choose to build on as appropriate for their own needs. Chicago has an opportunity to establish clear expectations before data center development accelerates with no guardrails. We also have an opportunity and responsibility to ensure that data centers support and not undermine our clean energy future. If massive new electricity demand arrives without new clean energy storage and flexible operations, it can increase consumer bills, strain the grid, and make it harder for us to meet our climate goals. If a company is building one of the largest new electricity loads in the state, it should also help build a clean new energy needed to serve that load, rather than taking the new clean energy that folks like us are using. That approach not only protects existing customers, it also reduces pressure on the grid and ensures that the clean energy transition is bolstered. With the right guardrails, data centers can support new renewable energy, deploy battery storage, and improve grid reliability. Ultimately, this conversation is about how Chicago meets the moment. We have an opportunity to learn from what's happening across Illinois and put the right guardrails in place now, so that if data centers are built increasingly in Chicago, they're developed in a way that protects our communities and reflects the values the city has worked so hard to advance. Thank you. Thank you so much. And lastly, I turned my own mic off. We'll hear from Craig Huffman from MetroEdge. Thank you. Good afternoon, Chairman, members of the committee, Commissioner Tovar, and the working group. Thank you for this report and the chance to testify today. I read the report closely, and I believe this committee is pursuing a thoughtful, serious approach to future data center development in Chicago. And I want to be part of getting it right. My name is Craig Huffman. I am the co-founder and CEO of MetroEdge Development Partners. We're a commercial real estate development firm, and we're not headquartered in Loudoun County or Northern Virginia. We're based here in Chicago by Chicagoans. Our inaugural development, IMD1, is located in the Illinois Medical District. Our land is located on the Illinois Medical District on the West Side of Chicago, and we are joint venturing with one of the top data center developers, H5 Data Centers, to build a world-class facility. H5 is partnering with us because our site is now very valuable at a time when data center sites are hard to secure, and frankly, we know Chicago better than they do. A little bit about my background. I was born and raised on the South Side by two public school educators who fled the Jim Crow South in the 1960s. I attended public elementary school, went on to Morehouse College, then returned to Chicago for two master's degrees from the University of Chicago, one in nonprofit management and an MBA in finance. I left the stability of working for someone else in 2004 to become a full-time real estate entrepreneur, and I became the first in my family to do so. MetroEdge has been the hardest venture that I've ever pursued because I came to this industry lacking the privilege that many of my colleagues and competitors enjoy. It has taken years of navigating skeptical looks, rising anti-data center sentiment, and way too many microaggressions to even count while I learned this high barrier to entry industry from the ground up, all while there was no guarantee that our plan to bring a data center to the West Side would work. As of today, I am the only African American equity partner in an active data center development in Chicago. Over the last six years, I've traveled the US meeting with data center operators, developers, and investors. Given the enormous upfront capital investment this industry now requires, there's almost no representation of traditional US minority groups in data center development, and that absence isn't an accident. It reflects who has historically had access to investment capital, technology relationships, and the private conversations where confidential transaction details are often negotiated and finalized. That's part of why I'm here, not to defend our data center development, but to show what's possible when the data center industry looks different than it historically has, and when the people building it have a real commitment to the communities where they invest. In 2025, technology and data center investment drove over 80% of the total US GDP growth. Illinois has been a top destination for the last few years. We cannot pretend this infrastructure isn't relevant to Chicago's future as a global city. At the end of the day, data centers are the plumbing for the internet. Why does all this matter? The committee's report highlights a pattern of massive, out-of-town capital showing up with a permit application, a name nobody's heard of, and a promise nobody can verify. Communities have asked, "What's with the secret NDAs? Why is there no public dialogue? Where's the transparency?" These are not unreasonable questions. For us, transparency has meant showing up at meetings ourselves, using our own names, answering hard questions in the room, rather than through a law firm or a lobbyist. When the working group lays out its framework, environmental permitting, responsible zoning, transparent reporting, I don't hear a burden. I really don't. I hear how we, as MetroEdge, have approached IMD1 from day one, before anyone required it. And here are three reasons why we believe our model should be a model this committee considers for future investment. First, our development will have near zero water use. Water was the most frequently raised concern at the last community conversation event, and the report notes hyperscale water use can rival a small town's daily consumption. We agree. IMD1 is designed with a closed-loop system that will allow us to meet a water usage efficiency of zero. We will not be putting a hose in Lake Michigan for our cooling, as some people have alleged. This is not a future goal or promise on paper. It's a direct built-in answer to the report's central concern. Second, IMD1 is the smaller infill redevelopment model the report says Chicago should pursue, not the sprawling hyperscale campuses driving national concern. We have a four-story, roughly 150,000 square foot facility on less than four acres on a site that's been vacant for 50 years. We're bringing investment back to this site, and our data center will serve healthcare and life sciences institutions within the district itself. Not an out-of-state AI training load, a genuinely different use case than the ones driving the report's grid strain and land use concerns. And then third, I really want to emphasize this, community benefits. The report demanded local hiring, job training pipelines, and tax reinvestment rather than buy-right development with no community return. We believe the committee's recommendations are a really good start, but not enough. There needs to be more. Data centers should prioritize recruiting and training talent from local neighborhoods and pursue more inclusive partnerships with the wide range of vendors that have profited from the recent data center investment boom. In our West Side location, we're also pursuing a charitable vehicle known as a donor-advised fund that would incentivize some of the very large customers that rely on data centers, such as Amazon, Microsoft, Google Cloud, Oracle, Meta, CoreWeave, and many others, to support college scholarships, home buyer down payment assistance, and workforce training. To date, only out-of-town philanthropy has shown interest in this idea, which tells you something about the need to include more groups in community benefit discussions. At the end of the day, a data center should not just be in the community, it should also be of the community. In closing, I understand the instinct to slow everything down until every question is answered. The concerns in this report, noise, emissions, grid strain, water use, Chicago dollars leaving Chicago, are all legitimate and deserve rigor. But data centers are no longer optional infrastructure. They run hospital records, payroll systems, and the internet that many of us, and those of you that are elected officials, your very constituents, will use when they go home tonight. The question was never whether Chicago hosts the infrastructure. It's how we do it in an environmentally responsible way. It's who builds it and for whose benefit. We can curse every project at the door or do the harder thing, light a candle, set the standard, and build a model that lets local communities be genuine partners. That's why I'm asking you to look at our joint venture with H5 and consider these elements of our model in your approach going forward. A homegrown developer, local. A vacant site in need of investment, a vacant site not next to residential I add. A plan to partner with and listen to the community. And last, and certainly not least, transparency on numbers. We have no problem reporting any of the things that the committee has proposed. It's good policy. I'm from here. I believe in this city. I was born and raised here. You need to be local to have the lived experience of what a city means. And so if a startup Chicago company like Metro Edge can meet this bar, there is no excuse for other developers not to do it. Thank you, and I'm happy to take any questions. Thank you so much, Craig. Thank you again to all of our panelists and we're now going to open up for questions from members. I've got Alder Lawson up first, and then just let me know. Okay. Great. Thank you, Chair. There's a lot of information here, and it's a lot of good information. I want to thank everybody from the panel for sharing this, and Chair, for putting it together. I never take my zoning hat off, so maybe I'll just start with that because what I'm hearing is, I think we have opportunities to regulate location, to regulate size, to regulate certain usages. Obviously, if we put everything into a PD, that's a lot of time and energy, but maybe there's a way to look at it in another way. Real quick, about half are co-located, I think I heard, of the 39 in the city. Is it half that are co-located with some other structure or building as opposed to standalone? I know half are in a PD, but not because they're required to be, because they're co-located use or their campus, whatever it is, is in a PD. Thanks, Alderman. Maybe I'll answer that. For the record, my name's Bradley Roback with the Department of Planning and Development. I think what you're referring to in the report, the 39 that we identified there, are about 25% that are sort of standalone. Okay. The other 75 are located within an existing building. They're a room or a bigger room or a couple of floors, something like that. Okay. I think some of the co-location that- Really quickly- Sure ... can the DOE team, can we get the slide back up? Sorry. I know the slide that had the number. Need someone to log into the computer. Yeah. Gina, it's your f*****g All right. Sorry, please continue. Oh, yeah. Thanks. Good timing. I was going to refer to that that Jared also reported on co-location. Right. I think there's some overlap with terms that are there. Okay. But I just wanted to point out that a lot of the ones that we identified are actually in existing buildings already. Well, and I use that term co-location because we use it for utility infrastructure now. Cell towers, right? Yeah. If it's part of a larger facility, if it's a standalone, they're treated differently, as they should be. There's a dot in Rogers Park, which I assume is on Loyalist campus. I'm an alum, right? So right, that's well, maybe standalone or part of a building that's part of a larger PDA campus, and probably not serving anything beyond the campus, I would think either. Not that it would make a difference necessarily, but... Yes. Co-location. I don't know. Sorry. I don't know the actual usage. We didn't have that kind of data- Right ... to look at. Yeah. But this is the slide we wanted to look at. 10 standalone, 29. Okay. All right, so you said about 25%. Could I also add something about AI, just quickly? There's been a lot in the news about AI. The first iteration of AI was these massive campuses. They don't want to do them in big cities. The land's too expensive, it's too difficult. You want to get 1,000 acres, you're not coming to Chicago. You're going out to the middle of nowhere. And a lot of the pushback has occurred. I have traveled the country and seen data centers. I'll be honest, when I went to Virginia, I thought to myself, "This is too many damn data centers out here." They were everywhere, right? Part of it is that's where the fiber came in to the country. Right. And so regulating is important because otherwise it becomes like little kids in soccer. Anybody seen little kids play soccer? Everybody runs to the ball, right? Instead of spreading out. And so the first iteration of AI was these massive campuses. The next iteration is going to be what's known as edge data centers. These are smaller footprint. Think cell phone towers when we all were using mobile phones and we used to get dropped calls and we said, "Oh, the coverage is going to be bad." Well, we don't really use cell phone towers the same way. Data centers are providing that connectivity, and when we think about smart cities, we think about autonomous vehicles, we think about all the things that we frankly are going to rely upon to keep a city like Chicago world-class, it's going to require this combination of infrastructure that's large. And I agree. Regulate the big data centers. I know some of those groups, and they certainly should do more. I think at the same time, within cities, think NFL cities, to expand upon the massive need, they're going to need to be present. So what I think you're going to see coming down the pipe for Chicago is going to be more of these compact edge facilities, because you just don't have the land. You don't. Our site's on four acres. Let that sink in, right? And quite honestly, 10 acres or less is really your sweet spot for edge. Okay. So if that's helpful in terms of, and so you could have a single customer take an edge facility, but also a single customer using one of these massive AI facilities- Right ... in the middle of nowhere. Right. 10 acres can be hard to come by. It can. Four is easier. In a neighborhood like mine, right? Absolutely. Two. And that's another point. Our site, 50 years ago, had a manufacturing facility that employed a lot of people I pulled up some historical photos of this manufacturing facility, and I thought it was a cloudy day. I said, "Oh, look at all the clouds." No, it was all the smoke billowing out of the building- Right ... at a time when we measured environmental standards. I think just as we looked at that era as being dirty and we correct it, this is an opportunity to correct data centers going forward. But I'll tell you, it shouldn't be as difficult because while I was sitting here, I pulled up, even when you talk about diesel, the fuel that goes in diesel. There are environmental solutions. The answers- Right ... are within finding solutions, not just blocking the progress. Sorry. That's actually- Oh, uh, yeah, I was going to say I think, Commissioner Tovar wants to talk. Yeah. I just want to offer one point. And I appreciate the feedback, Craig, and I think you've raised some really good points. I don't want to minimize the impacts of what we would perceive as smaller data centers. I think that the report lays out that there are still significant impacts in an urban context that are important here. That is validated by just our experience with co-located facilities. We're seeing an increase in 911 complaints or 311 complaints rather because of issues related to sound, related to noise, concern about diesel generators, the testing, the air pollution. Those are valid concerns. And while Craig is correct, we may not see these hyperscale facilities, it certainly doesn't minimize the need to think about important and smart regulations for what we would call "small to medium facilities." Right. A 20 megawatt facility in the city of Chicago could be the same size as what we would consider a hyperscale Amazon facility, right? Or a big distribution warehouse. Those are big impacts. That's a big footprint. That is a sizable amount of generators that we would see, that would provide backup diesel power, which could burn particulate matter, which is- Actually, yeah ... a carcinogen, and that is concerning for us. So I do just want to name that both of those are important, as we think about this within the context of the city of Chicago. Sure. I did want to ask about diesel, so maybe I just go over to there. What's the other option? There are backups of all kinds. I've had diesel generators outside Wrigley Field, Commissioner, as you know. And I can't imagine 10 of them all in a row. I can-- Oh. Yeah, you guys want to- I can speak on that. Mm-hmm. Yeah. So first of all, for diesel generators, there are different tiers. Right. So tier four, like the most efficient ones, they're still polluting, to be clear, but they are more efficient than tier one to tier three. Right. The cleanest option to replace those are battery storage. Those can act in the same way, where you have batteries. They could be standalone batteries or they could be powered by clean energy, like solar or wind or whatever. And they can be the same as diesel, where you flip a switch, but they'll be battery storage instead. So highly recommend requiring data centers to either use battery storage partially in like a hybrid setup and certainly, combined with, if you do still want them to be allowed to use diesel generators, make them the most efficient ones possible. Okay. All right. Could I add a little bit of perspective? Sure. We're in a medical district with our site, four of the largest hospitals. Every hospital uses substantial number of generators because they're mission critical facilities. Every hospital in Chicago requires generators. I'm not comparing, but I'm saying just like every golf course uses substantially more water than many data centers. We have to begin to understand that, yes, we should do it better, but we also have to be consistent. When it comes to batteries, I agree. In our design, we have batteries as a backup. But when we talk to customers, right, some of the large names that are driving our economy, they dictate. They're the tenant. They say, "No, we really want generators instead of battery. No, we don't want solar." I love solar. I'm putting it on my home. I tried to explore it. Some of this is a negotiation that has to happen both at the community level, but also these companies that are using have to understand that if they're going to come into a city, the requirements to operate are going to be X, Y, right? It's not just the developer making a decision in a bubble. It's also the groups that are going to use the data center. Because case in point, when we build this, I won't even have access to parts of the building that the customer is in for security purposes. Right. I think sort of speaks to my next question as to what we can regulate and what the state has to regulate, right? Obviously, location, things like that. But the type of generator being used, is that something we don't need the state on? Energy limits and water limits are a state issue, though. If we were to say, per center or per capacity, you're limited to a certain number of gallons or megawatts. Can I be a traitor to my industry for a minute? You might have been already. Yeah, right. I think I have got some death threats. But what I want to say is, I think a lot of the pushback on data centers in the long run is good. I really do. And I'll tell you why, because it forces innovation. I'm having conversations with some of the hyperscalers. They're not ignoring what's happening around the country. At the end of the day, these are extremely profitable investments, right? I hope no one missed the fact that I am sitting on a financial model where we are proposing to pay for college scholarships, down payment assistance, and training. It can be afforded in our business model and some. Right. So what I would say to people is the secrecy around this industry is a problem, but there's also a need for us to have conversations about, hey, the environmental is non-negotiable, but are there other things that you can do in the community? I use the example, right? I'm old enough to remember Little League baseball teams sponsored by local businesses. And those businesses had a connection. As we went national franchises, we lost that You rarely see sports teams sponsored by a local business. If a data center is going to require local resources, it needs to think like a local business. It needs to be a community partner and operate that way. I think that's sort of where my question is going, as to what ability do we have to require or regulate that? I know we can put together a CVA on anything, but our ability to enforce it and require it is maybe where the teeth are here. Yeah. I can add a little bit, Alderman. So, without getting into the nitty-gritty of a very specific requirement, the short answer is, absolutely the state, and as Sarah talked about, the federal government certainly have a lot to say about energy. But that doesn't mean that local governments can't craft particular requirements around, for example, a deployment of renewable energy or water efficiency. To give a couple examples, the city of Aurora actually has a minimum renewable energy provision in the ordinance that it recently passed. Okay. So this is an ordinance that actually is on the books now as of earlier this spring. So that's just one example locally. And you see similar examples in other parts of the country. Like I said earlier, the nice thing here is we have so many communities working on this issue at the same time. You're really seeing great ideas bubble up to the surface. So you're absolutely right that the state has a lot to say, specifically about utilities and energy. But that doesn't mean that we, as a city, just as things exist for the larger questions regarding our electric utility, we as a city and you as a council work on various issues relating to regulating ComEd all the time, even though absolutely the state legislature and the ICC have a big role to play. So I wouldn't count it out. Well, I think we're going to have to work with them closely as this rolls out, right? That's going to be clear for everyone's use. Just a couple other quick questions, then I'll turn it back over, Chair. Well, let me say, this is not the first emerging industry the city's been behind the eight ball on. You name it. I've been around here a long time. Whether it was Uber or Lyft, or Rideshare, or HouseShare, or I got the Coco and the Serve going. You name it, right? Government is usually the last one to react, and local government sometimes even more so. So, we have to get up to speed and figure things out, but what are we doing right now? So, what does the approval process look like right now? Is it just sort of all by right everywhere, unless it's in the PD for some other reason? Yeah. Thanks, Alderman. Or a B, C, and M, right? You can't do it in a B1 or an R. Yeah. There's a table in the report- Correct ... that explains where you can do it by right- Right ... currently. It would be a planned development if it exceeds the thresholds that are in the zone. Sure. Who's storing our data, the city's data right now? Who do we use? Where is it at? Do we know? That's a report. Alderman Vegas is- If they tell you... Will they have to kill me if they do? We'll have a closed briefing on that one, maybe through the chair. I think we can briefly answer, but we could certainly, through the chair, get back through DTI. Yeah. I believe some of it is in city facilities, and then if we have cloud providers like Microsoft, some of it is likely in Microsoft contracted facilities. I think that's the short answer. It's a mix. Okay. Great. That's all I have. I look forward to working together on all this. Again, I'll keep my zoning hat on and be helpful there. Thank you. Thank you, Chair. Can I just add- Thanks, Alderman. Can I just add one thing? Oh, yeah. Mm-hmm. Okay, there we go. I just wanted to share a list of the regulations that are in the Aurora Responsible Data Center Ordinance to get a sense of the kinds of things that they were able to do. And then if we could get a copy of that afterwards, too, so we can share. Yeah, absolutely. For sure. But just briefly, they regulate operational impacts, including energy use, water use, noise, landscaping and screening, emergency backup power, stormwater management, environmental performance standards, and operational reporting requirements. They also establish zoning and siting standards, require city council approval, and conditional use review for new facilities. And then lastly, they created a data center privacy protection ordinance that governs privacy-related practices. But I can share the full thing- Great ... for sure. Thank you. All right. Alder Ramirez, and then Alder Cruz. The press. Okay, great. Well, I want to thank the committee. It's a really great panel from the working group, to hearing Craig's perspective. I don't know if we can get the map of where the data centers currently exist back up. I'm really interested about this land use, this idea about four acres versus maybe a much larger space. And then also something that you said, Jared, just about the demand needed in terms of close proximity. Can you talk a little bit about where we started as a city, that growth to where we are now, and what you expect, I guess, in the future in terms of that demand? I guess what I really want to know is that does it make sense if the demand is there and we need to build out to have smaller ones in various places? What I'm worried about is manufacturing districts where I'm from on the southwest side, that we have that land capacity, and that we potentially have just a very large one in a very concrete area, concentrated area. Yeah, absolutely. So several people have mentioned, I believe myself included, that Chicago was an early center for data center development. We started to develop data centers here, I believe as recently as 20 years ago, where some of the currently operating data centers were founded. That was long before artificial intelligence. Those data centers primarily served a telecommunications function, so the internet, but also phone calls, text message, all cloud services. Those go through data centers totally separate from artificial intelligence. The large boom that we're seeing today is due primarily to the growth in artificial intelligence. The really large giga scale, hyper scale facilities that you see on the news are for training artificial intelligence models. But there are also separate, smaller artificial intelligence data centers. Those are known as inference data centers. You can kind of think of it as a training center is an oil refinery, and an inference center is more of a gas station. So when you are actually running ChatGPT or another program, that's not going to the large gigawatt scale facility in rural areas. That's probably going to a smaller edge data center to help speed up the processing time. So we likely will see more of those smaller data centers popping up. I will also say that the growth in artificial intelligence has also increased demand for other types of data centers. So as more people are using these digital services, there's more demand for cloud storage, which creates demand for more of those smaller distributed data centers as well. I will caveat all of this by saying I am not an expert in industry forecasts, and, as Sarah mentioned previously, this industry is notoriously speculative, so it's really hard to say with certain this is what the industry will look like in the future. But I will broadly agree with your assertion that we will likely see more of these smaller data centers in urban areas while these larger facilities will likely be concentrated in more rural areas. Thank you. My next set of questions is around something that Sarah was talking about, about the grid. And so, in my opinion, ComEd did a recent communication that was asking residents, mostly from the West Side, also predominantly Latino, African American areas, about their usage on the grid. And so there was large conversation online about why that was a chosen selected group to use less power when we had data centers that were presumably using more. And so I guess my question is, I guess outside of land use, how else are we thinking about the power grid, how it should be obviously serving our residents that are most vulnerable, clearly now during the heat wave especially. And, is there something that we could request from ComEd as well? Because you mentioned sort of this $3 billion investment that they had made, and so is there a demand there for us to have a conversation? Yeah. Well, so first of all, if you have an example of a call for conservation from ComEd to a specific community, I'd like to see that, because I did not see that. I'm not aware of that. I know that during the heat waves of late, a lot of us, especially those of us on special like time of use rates or hourly rates that are time variant, not just levelized over the course of the day, but signed up proactively for a time variant rate, did receive alerts that the real-time prices were high. And so I get those. But I'm unaware of anything that went out to a specific neighborhood, so I want to see that because that might be problematic. Commissioner, do you want to- It was for the West Side substation area, I think. Oh my goodness. I think, Commissioner. I don't know, Commissioner. Oh, sorry. Jared. Not to derail on the larger question. Yeah. So Alder, we know what you're referring to. Our understanding, obviously not representing the company directly, but our understanding is that the company was mitigating a possible risk of a substation off of I-555 that if it had gone down, would have affected the west and southwest sides of the city, as well as a number of west suburban communities. I think as far as we understand at DOE, this was a localized issue with that substation. I think you make a very valid point about the role that data centers will play during extreme heat events where there's a concern about having enough power. This particular issue was more due to this local facility. So a data center going off the grid would only have helped there if it was within the footprint of this particular substation, which I don't think we know one way or the other whether there are particular data centers that would've helped in that sense. And I'll add to that. So ComEd did reach out, and it was a mechanical risk at a particular substation, so they said, like, "Hey, customers in that area are going to get a note with this ask while we work on repairing this to make sure that it doesn't go out." Yeah. But can I throw one thing in, though, where you are very much raising an important issue. Meanwhile, during the heat wave, PJM, which runs the overall grid from here all the way to the East Coast, so the big grid that supplies us, it's much broader than just ComEd- They also had to begin looking at extreme measures due to a concern that the overall grid was going to run out of supply, and they actually went to FERC, that's this federal agency that regulates the big grids. They asked for permission, if need be, to order the data centers to go offline, which means that they would've been using backup generations solely. Now, my understanding, you can correct me if I'm wrong, Sarah, did they actually take that measure or they just had the permission to take it? They had permission to take it. Yeah. It didn't quite come to that point, but we're certainly headed into some very difficult questions, when the grid is potentially hitting a point where there's not enough power. Managing peaks in demand for electricity is a lot of what drives up overall costs year round. I talked about those wholesale capacity auctions at PJM. Capacity is basically extra payments that we make to generators to ensure they're there when it's super hot outside and we're all running our air conditioning all at once, and there are data centers running, too. And so that's really expensive, and that is also dirty. We have peaker plants. In fact, your great report talks about, I think, peaker plants in the city of Chicago that burn fossil fuels that run only a very limited number of hours every year. They only kick on when there's an immense strain, immense peak in the grid. So I think it's really important, a lot of what I do when I educate consumers about how our electric grid works is tell them that. A lot of what we're paying for when we're paying for electricity is not the energy that we're using, it's the energy that we could be using during these periods of peak demand. We have to build up all this generation and grid infrastructure to meet these demands. And a lot of what I focus on is trying to help put together policies that incentivize households and institutions to curb their usage at these peak times if they're able to safely. Not to force my grandma to do that, but ways to leverage any kind of flexibility. And that's what we would love to see from data centers, as long as flexibility doesn't mean running diesel generators, which nowadays is what it looks like. So the point, and I'm mad at my friends at ComEd for not giving me the heads-up about this alert that went out. I'm going to be calling my friends over there to be like, "Hey." Because I think we do a lot of work in the field, and we need to know that this is happening out there. I'm so glad I'm here because I'm- Yeah ... bowled over by the fact that this happened. I had no clue. But it's also really important to make sure that these strains on the grid aren't used as an excuse to gold plate the system. That's the term that we use in utility regulation is gold plating, because that's how the utilities make money, is by spending our money. They can earn a return on that. So that's what we're in the middle of with these multi-year grid plan at the Illinois Commerce Commission right now. And like I said earlier, it's always wonderful when the city of Chicago has the capacity to show up in some of these proceedings because it's really important. Okay, we know some investment is needed. We don't want to have to turn off people in your neighborhood, lest the substation explode or whatever. But on the other hand, we don't want this to be an excuse for just unchecked spending. Do you want to add, Craig, or...? Yeah, I was going to talk about our deal. I think I may be the only person here that's a partner in a data center transaction, so there's a lot of information I have, because the last six years I've been banging my head against the wall. ComEd is about to have us pay $4 million to upgrade the two substations that are going to feed our site. We've spent about $10 million to date, just permits and approval. This is not a cheap business, and I guess what I'm saying is you have billionaires that are financing this business. They should do their part. ComEd was asking for too little years ago. They have adjusted that. It was long overdue. Five data center developers might chase Microsoft needing one site. They all go to ComEd and say, "We need a gigawatt," but it's only one gigawatt, it's not five gigawatts. So there are a lot of things about this industry where we're building the car as we're driving it. But the thing I want to add, I think the data center industry has room for improvement, but there's also room for it in Chicago. Why do I say that? We need revenue. Unless there's a better idea, data centers generate the highest property tax revenue of any commercial real estate asset in the United States. Hard stop. So when we begin to think about vacant areas, right? And I can tell you, I've traveled the country. The billionaires who don't look like me that run this industry, and 99.9% of them would rather not be in Chicago. They've told me this. They think the politics, whether it's folks that they think are too liberal or whatever, they don't want to be in the big cities because they don't know how to navigate. And so the opportunity is to think about these conversations, not in a way to say, "We don't want you." But if you're going to be here, here are the expectations on the environmental side. But again, I don't want to skip over this. These are extremely profitable assets that can help people deal with the rising cost of inflation, the uncertainty of job losses, and try to pave the way for people to feel a little less certain. It's not going to solve the city's problems, but in the neighborhood, our view was the IMD has 29,000 employees, roughly. We can't impact them all, but that's an area that we consider our community. Each business should be thinking that way, right? And I'll be honest with you, as I've talked to some of the people that are in this business, that's not how they're wired. The guy with the master's in nonprofit, right, who spent time community organizing can think that way. If you've only been on the business side, it's a foreign language, and that's a lot of our problems here. People aren't thinking about the folks that are in the neighborhoods and what we need to do to balance that. But the good news is, if you go to a hospital and say, "Get rid of your generators," their profit margin doesn't allow them to do it. This industry, it's a little different story. Okay. I'll ask another question. I'll allow my other colleagues. The sustainable development part. I know that you guys have proposed ideas about ordinances that we could potentially pass. Are you guys wanting it to be retroactive? Is there a way for us to work with the people that already exist in the city and make things better? I don't know if Jared or Angela, you wanted to... Retroactive sustainable development policy. It's an environmental permit. So yeah, my question is really about how are we working with the data centers that exist. If we do come to find that a lot of the data shows that some of the centers are harmful for the community, is there going to be room for them to make those changes? Yeah. So what I can speak to is on the environmental permitting side, because I think that that's a very important question. I'll say on the zoning side, and I'll let Brad elaborate, there is no precedence for retroactive measures on the zoning end, especially if something was permitted by right. And so I won't speak to that. But what I can say is that on the environmental permitting end, the proposal in the report does lay out a very concrete strategy for us to build an environmental permitting requirement, both for new and existing data centers. And I would urge council to really consider that. Right now, on the environmental permitting side, the only required permit that a data center has to pursue, and much like any other diesel generator user, is an air pollution control permit. Having an environmental permit creates a regulatory framework. It could require reporting. It could require ongoing monitoring. It could require new environmental standards. And that could happen, and that could be a required check-in, a renewal permit at a much more frequent cadence than what we have with our air pollution control. So it really does move us to think about a standard for data centers specifically that does not exist today. And again, that could be something that we would require that for existing data centers as well. That proposal would require council approval. But it would certainly be something that I would love to work with this group here on ensuring that we have the right measures in place to pursue. Thank you so much. Thank you, Chair. Thank you. All right, Alder Cruz. Thank you, Chairman Hadden, and also thank you to the panelists. I think this is a great panelist from experts across the board, not only the city advocacy group and also for people from the industry. So I want to say I appreciate that. Typically, sometimes we have one or the other. So this is a very well-balanced panel. But I do have some questions and more also clarification on certain things. And I'll start with Sarah. Sarah, at one point you said something between the lines of data centers should have some financial commitment up front. And based on the report on page 38, it mentions the possibility of making industrial users pay more for water. So my question is, is this trying to make the larger users pay for more once they cross a certain threshold of quantity use? So what will be the impact if there will be a bigger financial commitment up front? What would this mean to everyone? Because we talked about the commit bill and how this reflects to everyone. I want to see a little more, if you can explain that and what will be the impact, but also to Craig and the industry, what is that up front? What would that mean to the industry as well? I think we're all trying to balance how do we keep up technology, but also how we are environmental responsibly. So I just wanted to get your thoughts on that. Yeah, sure. So to the water side, I'll probably defer to my friends at the city because my expertise is around the state-regulated utilities, not municipal water systems. I don't know anything about ComEd's water rate making or what kind of deposit policies the City of Chicago has in place for water. But when it comes to ComEd and the grid operators and the kinds of arrangements that the utility has with these large facilities over interconnecting to the ComEd system, this is heavily regulated and it's something that we're actively a part of. Craig mentioned that the old scheme for assessing deposits, ComEd would charge deposits to data centers if they wanted to interconnect. But before, those deposits were negligible. It was like $1 million per customer, which to me sounds like a lot of money, but it's chump change to the-- Was it less for smaller ones? It was chump change for maximum $1 million. Chump change for a lot of these hyperscalers. And so those deposits are now higher. The ICC approved a new tariff where it's kind of a stepped deposit structure. Now, the point I was making during my remarks is we believe that for a lot of interconnections Even those new deposit levels won't suffice to cover their costs in their entirety, and this is something that's been uncovered in a currently active ICC docket. So that's what we're talking about on the electric side. It's about forcing these facilities to pay upfront for the investments that they require, the grid upgrades that they require, so that if they don't show up, or that the rest of us aren't on the hook. Otherwise, all those costs get socialized across the rest of customers. And so we want to make sure... I'm all about minimizing that risk that these guys are leading to infrastructure investments that at least part of it is being covered by the rest of us. But on the water side, I'll let my friends over here say. Yeah. Thanks for the question, Alder. We can quickly describe and elaborate on what that... So first of all, this was one of the recommendations, if you recall, at the end, where more study would be needed before proceeding. But what we heard from a number of different stakeholders was to look at and research whether the city should change the way it currently charges all customers for water, which is uniform. Basically, whether you are a single-family homeowner or you are a large industrial facility or, in the middle, you're a restaurant, let's say, everyone is charged a uniform rate per, I think it's cubic feet is the measurement. It's one rate per cubic feet. There are other jurisdictions where there are rates by type of customer, commercial, industrial, residential, and that's actually also, as Sarah was alluding to, that's how it's done when it comes to things like electricity or natural gas. So there's a set of rates, like quantified rates for small residential customers that live in apartments, for single-family customers, for large industrial. There's a whole bunch of different categories. That's what the recommendation is about. It's about whether the city should take steps to investigate whether that structure is better for 2026 and onward, for all of the customers that receive water here. Makes sense. Okay. I'm also going to go to Andrew. I know he was with us in Zoom, but he had a chart with cooling technology trade-offs, and one of them it says one is more expensive for data centers. So just would be interested to see that and- Andrew, are you still with us? Yeah, I'm still here. Hi. And let me just pull that slide up so I can share it. This is from the Alliance for Water Efficiency's deck on data center primer. It's really good. But it actually doesn't talk about costs here. I would say I sort of asserted that the direct to chip cooling technologies are more expensive, which is true, versus just sort of running broad heating for the whole system. But you should be able to see this slide now, is that right? Yeah. So Andrew, based on that, in your research, because you gave us a lot of good information, whether it is the three different options. Based on your experience and what others are doing, what do you think is working best? I know there's some good on water efficiency. There's some other betters on energy. But based on your experience, out of those three areas, what is working better for other communities or is better received from community members? I would say I don't feel fully equipped to answer that question, and part of it is this just came out and another report looking at comparing different efficiencies at data centers is just coming out. So we're really on this sort of the high end of what does efficiency look like and what does cost effectiveness look like. We're kind of pretty early. The research is all happening right now. And so what I think is the best way to approach this is to set floors of some kind, is to say, "Look, this is the standard you have to meet." So in Aurora, the floor that they're setting is a water use efficiency standard. It's a number, and it compares the amount of liters your data center consumes to the amount of energy that it's using on its IT infrastructure. That's one sort of benchmark you could look at. Another would just be a more broad technological benchmark that just says, "You have to pick among this suite of technologies and better." So it sort of kicks out some of these less effective technologies. And the other thing I just want to note is direct to chip doesn't ever exist by itself, because that's going to get the heat off of your chip and into some system that's still in your facility. And again, the heat has to get out of your facility. That's how they're operating these. So, you'll have a direct to chip paired with some other closed loop system that's carrying a fluid from your heat source to your heat sink, which is either going to be the air or it's going to be like a cooling tower that is using water, evaporating water to get heat out of that loop. And then that loop brings the cool fluid back to your chips, and then it takes the heat from your chips, and it brings the hot fluid back, and then that's your closed loop system. So, I'm not sure if I was able to answer your question, but my gut says Find good floors to set and don't too much constrain innovation because there is some innovation happening here. Or find benchmarks. Yeah. No, I think as you said, trade-offs, and again, one of the panelists talked about in another what is going on, I believe you said in Aurora, we're trying to see what is working. What is working? What are some other things that perhaps we can mirror, we can look into? So that was my questions. What is something will work? But this was great information. I know this is something that just new came out. But I think, Craig, you had your hand up. Yeah. No, I think you addressed it. I don't want to be too dominant. I feel like I've been talking a lot. But I think at the end of the day, we're still in the early innings. This industry is moving fast. It's breaking things and moving fast. It's hard to keep track. The key piece is to have real conversations, not to assume that the people on the data center side are all bad. Like any industry, there are good people and bad people, but the question is, what are the parameters? How do you set guidelines that are going to protect communities? That's really what you want to do. I will tell you, edge computing will have groups that right now aren't looking at Chicago. There may be 39 data centers, but I would challenge you to say within the last 10 years, how many of those 39 have been built? And I would dare say not many. I probably know them. I could probably name them on one hand. And so the issue that you want to balance is you don't want to allow people to come in and do whatever they want, and I feel like data centers were given that latitude more than they should in certain communities. But you also don't want to erect these walls that shut down what could be investment that keeps your city world-class and relevant. You're going to hear people talking about smart cities. Mm-hmm. That means they have the infrastructure to be relevant. Do you want to be the city forward-facing, or do you want to be the old industrial city that's dying? It's really a question, and how do you balance it, right? And I don't think you just give it all to the billionaires, right, but you certainly also don't say no to anyone. I think it's a balancing act. I've named a couple things here. The property tax revenue. The City of Chicago has some pretty substantial unfunded pension obligations. Data centers won't fix it, but they should certainly be contributing tax revenue and other forms of revenue to support that, right? And this is an industry, again, I'm probably telling too much, can certainly afford it. It's okay. That's why we're here, to have those conversations. And I have more, but I know it's been a long day for all of us. But maybe when I talked about safeguards and strong environment, and one of the recommendations was to protect residents from air and noise pollution, and the idea was like, how do we do it, right? We enhance environment permitting process. Do you have more how to elaborate, like how do we do that? How do we protect our residents from noise and air pollution on data centers? If you have that, if you want to speak at it now, or if you want to send it through the chair, it's fine. And as a clarification, Alder Cruz, maybe some examples of what the standards would be? Yes. Mm-hmm. We'd be happy to submit some examples of that through the chair. Where we wanted to end in the report was not to be overly prescriptive, but to really give you a set of recommendations and an invitation to work closely with us to come together to design the regulations that are required to meet the needs of modern data centers. So for us, this was an offering and an invitation to continue working together. I think everyone on the panel, we're all clear, and we're in alignment that regulations need to happen. And so we'd be happy to share an example of what that can look like. Of course, we regulate many things across the city with environmental permits, and so there's certainly other precedences that we can point to where we've regulated very specific types of equipment or kept things below a threshold. I do want to just underscore Andrew's point that I think we can offer a floor just in terms of what the standards could be and still allow for ways in which we can both ensure that we are driving new innovation, and that we are continuing to support responsible growth. I think all of those things are possible together. And I think that the floor model is a really good pathway for the city to explore that. I do also just want to offer, we have the sustainable development policy here, which has provided an incredible example of ways in which we have advanced green building across the city. There are some emerging pathways that are new. Part of the sustainable development policy is that you can require a third-party framework, sustainable development guidelines to utilize, and get a third-party pathway to fulfill that goal. There are new ways in which you can do that with data centers as well. There are new frameworks that are available. And so I think continued coordination with DPD to think about how to use that framework as a way to lever green building principles, new innovation is an exciting prospect as well. If I can add, our design, as we went through the City of Chicago's process, technically makes it a lead design facility or a greener data center. This is where we need to take the conversation. How do we make these data centers more environmentally friendly? And the good news is that the major hyperscalers, I've traveled to some of them, they're all talking about this. So these aren't conversations that aren't already occurring. It's how do you plug in and look at best practices around the country? I'd love to be part of identifying examples that are positive. I was talking to someone yesterday saying, "Hey, give me examples where data centers are not as negative." Right? And I think that's where we want to start, because to say that we don't want any data centers, and I know this committee's not saying that, I just think it's shortsighted. It's cursing the darkness instead of figuring out ways to light a candle. And I've got Andrew. I see your hand. Andrew wanted to respond as well, and then Alderman Anna Hoppenworth. Thanks. Yeah, just to flag a few thoughts. One is, I think regulations are critical to defend against bad actors. That's why we do this, right? And that is an important-- You're not regulating for the person who wants to come in and do the right thing. I guess you should try to be as frictionless as possible if someone's going to do the right thing. But it's important to set standards so that we are ensuring that there is no bad data center developer that lands a data center anywhere in Illinois, but for Chicago. It sounds like the team in the department environment, I'm sorry if that's not the right title, I'm familiar with Chicago's groups, but has a good understanding of this. But I'll just flag power and water trade-off, right? And if you say a data center is going to use zero water, you're proposing they will air condition nonstop, which is going to be extremely energy intensive, and you're going to see water impacts at the generation side, and noise impacts locally. And so you do want to be thoughtful. And setting things like floors is helpful for allowing some of that flexibility for the right solution to be found without allowing anybody to come in below that floor that you've set and propose a solution that is extremely water consumptive. Or again, those pure air conditioning setups are not necessarily what I think anybody wants to see, because that's going to be pressuring our climate goals as well. So, just offering a little bit of perspective on that. Yeah, no, I appreciate everyone. And, just going back to what Commissioner Torrez said, I think that's really crucial what you said, and I think I praised that at the beginning. We're such a well-balanced group that you all have. Again, understanding what are the things we're trying to do, what is realistic, what is happening in the industry, and how do we come together. And you're right, it seems that everybody is in agreement to making some changes to ensure that, again, we are putting safeguards and we're protecting others. So I appreciate everybody's time. I know it has been a long day, but, I think this is a good way to start this conversation. I know things are moving fast, but so we've got to move fast as well on this topic. So, thank you, Chairman. Thank you so much. Alderman Anna Hoppenworth. Thank you, Chair. Thank you for having this hearing, Commissioner Tovar, and DOE, and DPD. Thank you, Craig and Kabi, and also Sarah for being here. I represent the 48th Ward, Edgewater and Uptown, right next to the lakefront. And so we are very concerned about protecting our greatest asset, which is our lakefront, and at the same time, have a diversity of people who live in our ward. And we're concerned about utilities and affordability, and generally just trying to stay in the city, to pay for all these things, including our water and our electricity. At the same time, we don't have any data centers really in Edgewater and Uptown. But I am concerned about the impact on our environment and of our people. I learned a lot today from everyone, including you, Craig, and Andrew, talking about the trade-offs. If there's no water being used, then impact is going to be on electricity. I would have appreciated a utility company being here, maybe ComEd. That would've been helpful just to frame, what is it that we can actually do here together? I'm glad to hear you bringing up other cities that are in Illinois, not in Virginia, that we can model our efforts to protect our environment and also to look at the opportunities, like what is it that we're doing with the wastewater. That's very interesting to me. Thank you for the sustainable development framework. I know that things are already in the works, that there was a lot of preparation that came into this hearing, so I just wanted to thank you all for that. And absolutely, we need to be faster because, as you said, there are 39 data centers in Chicago, but many of them have not been built yet. And also, AI consumption is rabid right now. So I just don't know what that's going to look like for my own neighborhood and what is going to be required of us from the city. So we must have guardrails in place, and so I am urging all of us to work together to figure that out and to not be behind Aurora. Thank you. Thank you so much, Alderman Anna Hoppenworth. I want to thank our panelists today. Again, thank you for your time. Thank you for your work. To the DOE team, thank you for the report, right, and from the working group and working group members. And I'm going to take a poll. I will say a lot of my colleagues, our colleagues, are still over in committee in finance, where the 78 and parking meters 2.0 are up for a vote. And I think that's where the rest of us will probably be headed after we convene here. But I will say, for myself, very interested in moving on some of these recommendations. And I appreciate the way you've organized them and tiered them as also knowing that there are things we can do right now that are going to help us actually maybe think of other things we should do, right? So I really like that idea of the transparency. Let's just start getting information. So, maybe we can intro that on Wednesday. What do you think, Leslie? But just saying, you guys in? Lenny, Ruth? Jump. You on board? All right. We're going to do it. Yeah, we're just going to intro it on the floor. But for real, to just get going on that, and then we'll gather more information that's going to help us inform more of what we want. Alderman Anna Hoppenworth, to your point, I know with ComEd, when we had our summer preparedness hearing this year, we were happy to get that update from them that Sarah mentioned, right, which was the permission that they got from our state governing body to require higher bonds for peace. But what else, right? To your point, what else should we be looking at? I think Alder Ramirez's question was around that of what are the investments that we could be doing? Where could we even be directing people if they're coming, of knowing we've got a site and a space? So I think we have continued conversations. So thank you for that. Look forward to taking some action with you all and with our committee members here. So, having no more questions, this concludes the items before our committee today. And with no further business, may I have a motion to adjourn? So moved. Alder Cruz moves. At 2:44, hearing no objections, so ordered. The meeting on the Committee on Environmental Protection and Energy is now adjourned. Thank you.